What the public permit record shows, not self-reported reviews.
Is MISSION CRITICAL SPECIALISTS INC a real contractor?
MISSION CRITICAL SPECIALISTS INC appears in public building-permit records with 7 permits filed through 2026 in and around Sacramento County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MISSION CRITICAL SPECIALISTS INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MISSION CRITICAL SPECIALISTS INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MISSION CRITICAL SPECIALISTS INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MISSION CRITICAL SPECIALISTS INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MISSION CRITICAL SPECIALISTS INC's work?
The most recent permit on record for MISSION CRITICAL SPECIALISTS INC is dated 2026-03-03, with 7 permits on file in total.
replacement of four (4) Primary and two (2) reserve EOL UPS units and the addition of mechanical exhaust fans, CH-01 - UPDATED INFO REV01 Un-interrupted Power Supply (UPS) replacement for SAC1 QTS located at 1100 North Market Boulevard. Sacramento, CA 95832. This is an upgrade of four UPS Units (A2-1, A2-2, A3-2 and B1-2) at the QTS Sacramento Facility. REV04 Upgrade of Four UPS Units (A2-1, A2-2, A3-2, and B1-2) at the QTS Sacramento FacilitySacramento County · 2026$1,400,000
Install new 400A distribution panel to feed the four existing power distribution units. Remove the existing 130kVA UPS, 80kVA UPS and associated equipment including the batteries. Install new 225kVA UPS, maintenance bypass cabinet and two battery cabinets in the existing 130kVA footprint.
UPS system replacement REV02 Changed plans to leave the existing manual transfer switch in place and refeed it with a new 50A circuitSacramento County · 2025$180,000
The installation of an additional four (4) STS/PDU combos (4 each), four (4) RPPs and seven (7) CRAH units in the west data hall, four (4) additional CRAH units at the QTS SAC Facility.Sacramento County · 2025$1,400,000
Move existing three (250A) busway feeders to different PDU's. Install RPP's (2-250A) and qty-24 L21-30R above racks /*Install rack distribution and balance IT loadSacramento County · 2025$85,000
The Centene data center will be adding two new 400A power distribution units to the end of their server racks. These units will be fed off existing Panels already in the datacenter. These existing panels have spare 400A breakers that will be utilized to feed the new units.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MISSION CRITICAL SPECIALISTS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MISSION CRITICAL SPECIALISTS INC's website. It links to this profile so homeowners can see the public permit record behind your work.