(MAIN) - Install one 200amp EV panel, install two dual port chargers on second floor. Existing EV panel install one dual port on the second floor, and one single ADA stall charger on the first floor. (EVCS in Employee & General Parking) REV02 Revised location of accessible EV charger installationSacramento County · 2026$60,936
(SUB CASE TO CBNC2025-00021) - Install one 200amp EV panel, install two dual port chargers on second floor. Existing EV panel install one dual port on the second floor, and one single ADA stall charger on the first floor. (EVCS in Employee & General Parking)Sacramento County · 2025
(CONVERTED FROM MISC2023-01052)
ADD ELECTRICAL CHARGING STATION EVCS ( CPF50 wall-mounted) IS FOR PRIVATE USE BY WALMART FLEET VEHICLES ONLYSacramento County · 2023$6,500
Hertz is proposing to install 10 EV charging stations within its Maintenance Area at the Sacramento International Airport. The equipment proposed is the Tesla Gen 3 stations, each rated for a maximum of 11.5 kW. It should be noted that the Gen 3 charger is within the category of a “Level 2” charger, with an overnight recharging period. No DC Fast Charging equipment is proposed as part of this request. Each charging station will be fed from a new 400A panel. This panel will be fed from the existing 1600A switchboard located within the Hertz Maintenance Building, each on a dedicated branch circuit. The total load of each charger is 11.5 kW. The total demand for the ten chargers does not exceed 125 kW., CH-01 Relocation of four (4) proposed electric vehicle (EV) charging stations to accommodate for a new structure being built on the site and removal of utility meter no longer required by SMUD. Overall scope of the project has not changed since original approval which is for the installation of 10 EV charging stations at the Hertz Maintenance Area at the Sacramento International Airport. EV chargers to be relocated will still be located within the Hertz Maintenance Area.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2023
$200,000
CH-01 - Install new ADA access. Rework parking lot to accommodate new Van access into buildingSacramento County · 2022
EPC - Installation one new 225-amp 120/208 sub service off the existing 480-volt panel, (3) dual port pedestal mounted chargers with all circuit runs, pending horizontal directional boring.City of Sacramento · 2025$89,533
Installation one new 225-amp 120/208 sub service off the existing 480-volt panel, (3) dual port pedestal mounted chargers with all circuit runs, pending horizontal directional boring.City of Sacramento · 2025$89,533
EPC - Install new 200A subpanel + 12 new charging stations in existing parking garage.City of Sacramento · 2025$113,782
EPC - -New 600 AMP 408Y/277V Switch gear fed from existing utility transformer
-Install 2 New Charge-point CPE250DC Fast Chargers + spare conduits for future charging stations in dealership parking lot
-EV Charging stations are for fleet vehicles only and not available to the general public. No accessibility standards required.City of Sacramento · 2024$144,000
CH-01 Relocation of four (4) proposed electric vehicle (EV) charging stations to accommodate for a new structure being built on the site and removal of utility meter no longer required by SMUD. Overall scope of the project has not changed since original approval which is for the installation of 10 EV charging stations at the Hertz Maintenance Area at the Sacramento International Airport. EV chargers to be relocated will still be located within the Hertz Maintenance Area.Sacramento County · 2023
Relocation of four (4) proposed electric vehicle (EV) charging stations to accommodate for a new structure being built on the site and removal of utility meter no longer required by SMUD. Overall scope of the project has not changed since original approval which is for the installation of 10 EV charging stations at the Hertz Maintenance Area at the Sacramento International Airport. EV chargers to be relocated will still be located within the Hertz Maintenance Area.Sacramento County · 2023
REWORK ADA ACCESSSacramento County · 2021