SVO-01
Base Building Infrastructure - Alterations to existing 68,000SF Data Center. Includes modifications to Data Halls 2 and 3, Electrical Rooms 2, 3, and 4 and supporting spaces to increase critical load capacity from 4MW existing to 6MW. Includes installation of new mechanical and electrical equipment in Data Halls and Electrical Rooms as well as setting 1 new Generator in existing generator yard and setting 6 new air-cooled chillers, 2 new pump skids and supporting mechanical and electrical equipment to the east of the existing building. Occupancy, building use and egress requirements are unchanged from existing permitted building.
Tenant Fit-out - First time fit-out of Staging Area and Data Halls 2 and 3 for new building tenant in existing 68,000SF Data Center. Includes construction of hot-aisle containment, busway, network tray, cabling and equipment racks. Occupancy, building use and egress requirements are unchanged from existing permitted building., CH-01 add new footings, CH-02 Seismic Anchorage Pipe Supports, ch-03, ch-04Sacramento County · 2021$20,050,000
CH-05 PIPE SUPPORT ANCHORAGE WITH KICKERSacramento County · 2021
CH-03 - Architectural door changes, ceiling grid changes and misc cleanup to support other design disciplines. Mechanical underground process piping change to C900 material and misc equipment shifts. Electrical feeder schedule updates, camlock connection added and emergency lighting circuits modified to connect to existing lighting inverter. Plumbing pipe routing revised to support updated humidifier locations and dual check backflow preventers added at humidifiers.Sacramento County · 2021
CH-04 Deferred Submittal for Mechanical Installations.Sacramento County · 2021
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2021
CH-01 add new footingsSacramento County · 2021
CH07 - WIRE MESH CAGE ANCHORAGESacramento County · 2021
CH-06 HOT AISLE CONTAINMENT ANCHORAGESacramento County · 2021
SVO-01
Base Building Infrastructure - Alterations to existing 68,000SF Data Center. Includes modifications to Data Halls 2 and 3, Electrical Rooms 2, 3, and 4 and supporting spaces to increase critical load capacity from 4MW existing to 6MW. Includes installation of new mechanical and electrical equipment in Data Halls and Electrical Rooms as well as setting 1 new Generator in existing generator yard and setting 6 new air-cooled chillers, 2 new pump skids and supporting mechanical and electrical equipment to the east of the existing building. Occupancy, building use and egress requirements are unchanged from existing permitted building.
Tenant Fit-out - First time fit-out of Staging Area and Data Halls 2 and 3 for new building tenant in existing 68,000SF Data Center. Includes construction of hot-aisle containment, busway, network tray, cabling and equipment racks. Occupancy, building use and egress requirements are unchanged from existing permitted building.Sacramento County · 2021