Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Client purchased a home with a new panel with no permit. We need to have someone come out and inspect the panel and see if we can correct the panel to get it up to code.Sacramento County · 2026$3,000
Upstairs master bathroom remodel including removal and replacement of tub and shower. New corner sink and new water closet roomSacramento County · 2025$52,000
Taking out tile surround, installing solid surfaces, new shower pan and valve.Sacramento County · 2025$6,000
Adding an 100 Sq Ft addition bathroom and closet to create a master suite.Sacramento County · 2025$16,608
Fire renovation like for like. Changing roof structure to trusses so that there will be an attic rather than roof HVAC unit. New stucco, new kitchen remodel, bath room remodel. New electrical panel all up to todays standards.Sacramento County · 2025$92,000
IN PROGRESS INSP REQUIRED; Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tear off old roof and replace with new cool roof.Sacramento County · 2024
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$14,000
IN PROGRESS INSP REQUIRED; Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Use new cool roof on house 30 year. Complete tear off and replace.Sacramento County · 2024$15,000
IN PROGRESS INSP REQUIRED; Tear off old composition roof and replace with new cool composition roofSacramento County · 2024$12,000
IN PROGRESS INSP REQUIRED; Tear off old composition shingles and replace with new felt buster synthetic paper, new 30 year shingle roofSacramento County · 2024$12,000
IN PROGRESS INSP REQUIRED; Tear off old composition roofing and replace with new 30 year composition roofing.Sacramento County · 2024$16,000
CH-01 Add post-and-pier support to existing floor-framing.Sacramento County · 2024
East unit will get kitchen and bath remodel, repairs to sub floor, removing gyp. board where mold is present and repair in kind ceiling joists as needed, possible replacement of wiring, replace post at porch, new windows and plumbing/lighting fixtures.
West unit will get new post at porch, porch light and windows.
new smoke alarms in both units.,
CH-01 Add post-and-pier support to existing floor-framing.Sacramento County · 2024$2,500
Permitted projects on public record. Addresses are omitted for privacy.