Installation of new 747 Sq Ft ADU with a 207.2 Sq Ft TrellisSacramento County · 2026$151,246
New 1,140 Sq Ft Manufactured ADU- To connect to Existing Sewer. Water to be connected to existing location near Garage, 200 Amp Panel Installed on Existing Residence ran underground to new Manufactured ADUSacramento County · 2026$47,789
1041 Sq Ft Manufactured ADU- Sewer to connect to existing line same with water
(N)200 Amp Metered Panel Overhead PowerlineSacramento County · 2026$43,612
New 1120 Sq. Ft. Manufactured Home with fire turnaround for fire department.
On Septic
XI-2 foundation
Propane tank is needed to supply home with gas
Address needed
Well on site to supply home with water, CH-01 XI-2 Foundation Instead of PiersSacramento County · 2025$46,032
CH-01 XI-2 Foundation Instead of PiersSacramento County · 2025
SITE PLAN: Upgrade electrical panel from 60 Amp 3 phase to 200 Amp 3 phase.
Upgrade well pump to 7.5 horse 3 phase.Sacramento County · 2023$4,000
Upgrade panel from 200 Amps to 400 Amps
Subcontractor Teleten Electric - 1011377
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2022
$5,000
Proposed 1600 SQ Ft Manufactured Home to be Installed Onsite
1600 Sq Ft Manufactured Home to be installed onsite - Septic Tank to serve home Fully Electric - 200 AMP Subpanel to serve Home - To be connected to existing 200 AMP Metered Panel Water to be connected to existing wellSacramento County · 2026$67,632
EPC - REMODEL: EXISTING VACANT SPACE. MOVING COMMERCIAL TENANT 'PIZZA HOUSE' RESTAURANT INTO TENANT SPACE.
REMODELING SPACE FOR PIZZA KITCHEN AND EATING AREA IN FRONT OF SUITE.
**SEE REVISION COM-2600065 - Submitting revisions requested by the Onsite Inspector - structural changes.City of Sacramento · 2025$87,000
XI-2 Foundation Instead of PiersSacramento County · 2025
New 1120 Sq. Ft. Manufactured Home with fire turnaround for fire department.
On Septic
XI-2 foundation
Propane tank is needed to supply home with gas
Address needed
Well on site to supply home with waterSacramento County · 2024$86,500
EPC - NEW 840 SF MANUFACTURED ADU. 2 BED 2 BATH. TO BE SERVE ON A SEPARATE SERVICE DROPCity of Sacramento · 2024$139,163
Permitted projects on public record. Addresses are omitted for privacy.