What the public permit record shows, not self-reported reviews.
Is GOLDEN STATE CONSTRUCTION GROUP INC a real contractor?
GOLDEN STATE CONSTRUCTION GROUP INC appears in public building-permit records with 8 permits filed through 2025 in and around Sacramento County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is GOLDEN STATE CONSTRUCTION GROUP INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to GOLDEN STATE CONSTRUCTION GROUP INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is GOLDEN STATE CONSTRUCTION GROUP INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. GOLDEN STATE CONSTRUCTION GROUP INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is GOLDEN STATE CONSTRUCTION GROUP INC's work?
The most recent permit on record for GOLDEN STATE CONSTRUCTION GROUP INC is dated 2025-03-15, with 8 permits on file in total.
Converted from MISC2021-00575, fees transferred over. - Addition of Electric vehicle charging station (s) (1 unit servicing 2 parking spaces with future infrastructure for an additional unit). Addition of a transformer and switchgear. Upgrade to 480 volt 3 phase.Sacramento County · 2025$250,000
this is a Separate permit for storage racking. Main permit under CBAC2020-00078.Sacramento County · 2021$10,000
CH-03 - Change the ceiling type at the back of the door store from acoustic tile to gypsum board.Sacramento County · 2021
CH-01 Floor plan, fuel supplySacramento County · 2021
Tenant ImprovementCity of San Jose · 2017$116,112
EPC - Retrofit site with one(1) electrical vehicle rapid charging station. Remove and replace existing parking stalls. Repair and replace paving to match existing surfaces to be compliant with current code.City of Sacramento · 2021$250,000
This is a change to CBAC 2020-00078 to change the ceiling type at the back of the door store from acoustic tile to gypsum board.Sacramento County · 2021
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you GOLDEN STATE CONSTRUCTION GROUP INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to GOLDEN STATE CONSTRUCTION GROUP INC's website. It links to this profile so homeowners can see the public permit record behind your work.