What the public permit record shows, not self-reported reviews.
Is FUGATE BUILDING AND INTERIORS a real contractor?
FUGATE BUILDING AND INTERIORS appears in public building-permit records with 7 permits filed through 2026 in and around Sacramento County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is FUGATE BUILDING AND INTERIORS's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to FUGATE BUILDING AND INTERIORS by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is FUGATE BUILDING AND INTERIORS licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. FUGATE BUILDING AND INTERIORS has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is FUGATE BUILDING AND INTERIORS's work?
The most recent permit on record for FUGATE BUILDING AND INTERIORS is dated 2026-01-26, with 7 permits on file in total.
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; remove existing composition roof install new 30 year composition dimensional roof.Sacramento County · 2026$8,500
IN PROGRESS INSP REQUIRED; Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; tear of existing shake roof install OSB install certainteed presidential compositionSacramento County · 2025$28,527
Tear off existing roof, repair as needed, install new roofing system.Sacramento County · 2025$21,250
• Plumber to run short 1” copper water main frame meter to house.
• Run Pex/copper to two hose bibs with valves for sprinkler valves.
• Re-pipe horizontal water lines to tub/shower, lav sink, toilet.
• Re-pipe horizontal and vertical lines to kitchen and water heater located outside.
• Provide and install Navien NPE 240 tankless water heater with gas line, water, relief valve, and condensate
lineSacramento County · 2024$15,550
EXPEDITED - EOTC REMODEL - Bathroom remodel to include no doors , walls or windows being moved. Plumbing fixtures and faucets to be replaced in place . Small skylight add and toilet. @nd bath to be upgraded to current state standard. ALL WORK SUBJECT TO FIELD INSPECTION.
Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. “Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).”
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you FUGATE BUILDING AND INTERIORS?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to FUGATE BUILDING AND INTERIORS's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Sacramento · 2023
$20,000
EPC - Demo/Removal; Kitchen cabinets, countertops, backsplash, window, drywall (as needed), header beams, studs (as needed for headers), entry wall (for pocket door), soffit over big window, kitchen flooring; Electrical -Install approx. (6) new can lights, Install dimmer switches ,Install outlets, as needed for new fridge location ,Wire for hood vent ,Install under cabinet lights ,Add outlet for refrigerator (Note- due to excess amount of insulation in ceiling, if insulation needs to be removed it will be executed with a change order); Plumbing -Plumb for new sink, faucet, water dispenser, garbage disposal, Plumb for dishwasher, Run water line to fridge for water/ice ,Install sink, faucet, water dispenser and garbage disposal; Carpentry-Frame new header openings, Install header Kitchen: widen by 32”, reduce depth of beam, install header beam (Note: if pier holes need to be installed, it will be executed as a change order); Floating shelves to be purchased separately and install will be executed as a change order. Install kitchen cabinets, Install crown and toe kicks for cabinets, Pocket door, Frame new pocket door opening, Install new pocket door, Patch in exterior lap siding at window and Add trim; Window-Frame window to smaller opening, Install new window, Drywall ,Replace and patch as needed. Appliances, Install hood vent (assuming same ducting is used, a change order will be executed for any ducting or extra work involving hood vent) ,Install oven/stove, dishwasher, and refrigerator.
WATER CONSERVING FIXTURES REQUIRED; SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIREDCity of Sacramento · 2021$39,435
Remodel space for coffee shop, all new equipment, tables, cold caseCity of Sacramento · 2018$75,000
Permitted projects on public record. Addresses are omitted for privacy.