NEW PRIMARY ELECTRICAL SERVICE
- NEW ELECTRICAL EQUIPMENT INFRASTRUCTURE TO SUPPORT EV CHARGING
- NEW EV CHARGERS FOR AMAZON FLEET/DELIVERY VEHICLES
- NEW PADS AND MINOR SITE MODIFICATIONS TO SUPPORT EV CHARGING AND EQUIPMENTSacramento County · 2026$1,000,000
Installation of 130 Electric Vehicle chargers in company vehicle parking lotSacramento County · 2026$1,000,000
First time tenant improvement. Buildout of new restrooms, offices, breakrooms, traning rooms, new roof top HVAC units, new lighting, new plumbing. (Demo Plan DMOC2021-00091), CH-01 - deferred submittal-storefront & glazing., CH-02 - Deferred submittal-electrical equipment anchorage., CH-03 - SUPPLEMENTAL PLAN CHANGE, see attached narrative 95-03 CH-03 - SUPPLEMENTAL PLAN CHANGE, see attached narrativeSacramento County · 2025$3,750,500
First time tenant improvement. Buildout of new restrooms, offices, breakrooms, traning rooms, new roof top HVAC units, new lighting, new plumbing.Sacramento County · 2025$3,750,500
164,648 SF Cold Storage Addition to Exsiting 437,712 SF Cold Storage Facility. New Addition will include accessory B, Office and other accessory support areas., CH-01 - Deferred submittal package of Specialty slabs and Structural Joists., CH-03 - Deferred catwalk submittal, CH04 - Deferred Submittal for Insulated Metal Panels, CH05 - Deferred exterior stair submittal., CH-06 Interior signage requirements and ingress door denotation., CH-07 Deferred metal stud walls submittal, CH-08 Deferred Refrigeration support pipe stand and Trapeze Hangers Submittal, CH09 - Extension of T-car track for pallet distribution into freezer room 7., CH10 - Deferred South Rooftop Maintenance Stair., CH11 - This is the installation of a wire hoist device., CH-12 - This is the addition of an exterior, open air gathering canopy and a free standing awning for the existing office building., CH-13 - This is the submission for two new guard shacks located at the site entry and exit.
Deferred Entry / Exit Guard Shacks 60-10 CH10 - Deferred South Rooftop Maintenance Stair. 60-13 CH-13 - This is the submission for two new guard shacks located at the site entry and exit.
Deferred Entry / Exit Guard Shacks REV01 This is the addition of an exterior canopy over the plan west walking path as well as two exterior wall mounted door awnings.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.