Install new underground 200amp SMUD underground to new 200amp Meter Main on backboard, and install underground conduit and power from Main Service Panel to 200amp Main Panel inside Modular ADU.Sacramento County · 2025$12,000
Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Upgrade existing 125amp Main Electrical Panel to 200amps in same locationSacramento County · 2024$5,000
Replace existing 200amp Main Electrical Panel, with new 200amp Main Electrical Panel in same location.Sacramento County · 2024$3,500
Replace burned 200amp Main Breaker in Main Electrical PanelSacramento County · 2024$650
SMUD will be installing electrical pole. I will be running underground service from that pole to the 400 amp service panel for our future home and shop. 200 amp panel at new modular home.Sacramento County · 2024$5,000
Replace fire Damaged 200amp Main Electircal Panel, with new 200amp Main Electircal Panel in same location.Sacramento County · 2024$3,800
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Replace existing 200amp Main Electrical Service Panel with new 200amp Main Electrical Service Panel in same location. Old panel is burning up at Main Breaker.Sacramento County · 2024
$2,700
Replace 25' customer pole, and upgrade Main Electrical Service Panel from 200amps to 400amps in same location next to barn.Sacramento County · 2023$9,500
Replace existing 200amp Pole Mounted Main Electrical Panel with new 200amp Main Electrical Panel in same location.
This is a storm related emergency panel change, please expedite permit.Sacramento County · 2023$3,000
Install new Backboard and Install new 400amp Main Electrical Service Panel per SMUD Specifications, trench from new Main Panel location to existing Well on property, and install power to well.Sacramento County · 2022$10,719
3 PHASE REPAIRSacramento County · 2022$1,000
Replace existing 200amp Main Electrical Panel, with new 200amp Main Electrical Panel in same location.Sacramento County · 2022$3,800
Permitted projects on public record. Addresses are omitted for privacy.