Relocate six existing electrical circuits for new production layoutSacramento County · 2026$9,850
SUBJECT TO FIELD APPROVAL.
Electrical panel upgrade.
Siemens Panel. Amperage to stay the same.
Electrical panel upgradeSacramento County · 2025$510
INSTALL A FACTORY BUILT PAINT STORAGE CONTAINER 208 SQ.FT.' ON EXISTING ON CONCRETE SLAB OUTSIDE BUILDING 11.“PAINT CONTAINER” IS A SELF CONTAIN PAINT STORAGE UNIT. THE FACTORY PLANS. ARE ATIACHED. WE ARE USING AN EXISTING 100/3 BREAKER FROM PANEL (E) HM TO FEED NEW CONTAINER.Sacramento County · 2025$89,800
Replace main panel due to failure, also update utility line to service panel all secondary lines to remain. service gear is same size replacementSacramento County · 2022$149,000
We lost power to a 100 amp 3 phase panel SMUD, was called out, and they replaced a fuse at the pole. Afterwards there was a noise coming from the panel. SMUD opened it up and found a short inside the panel we hired an Electrician to repair the damaged parts inside this panel. I am applying for this permit to order an County inspection and have SMUD replace the Meter and turn the power back on. Like for likeSacramento County · 2022$1,500
Res - 8.4 kW roof mount PV Solar, ( 21 ) Modules,
( 21 ) IQ7A-72-2-US micro-inverter, IQ Combiner X-IQ-AMI-240-3-ES,
AC disconnect, production meter
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2021
$12,480
MAIN BREAKER REPLACEMENT 1200 AMP 3PH 120/208 VOLTSCity of Sacramento · 2025$9,449
INSTALL A FACTORY BUILT PAINT STORAGE CONTAINER 208 SQ.FT.' ON EXISTING ON CONCRETE SLAB INSIDE BUILDING 11.“PAINT CONTAINER” IS A SELF CONTAIN PAINT STORAGE UNIT. THE FACTORY PLANS. ARE ATIACHED. WE ARE USING AN EXISTING 100/3 BREAKER FROM PANEL (E) HM TO FEED NEW CONTAINER.Sacramento County · 2022$89,800
CBNC2022 00015 Add UL listed storage container for paint storageSacramento County · 2022$89,800
SMUD / PG&E Safety Inspections are a one-time inspection. Additional inspections will cost $76.00 (Residential) or $152 (Commercial) each. If there is no access to the site or areas required by an Inspector, this will still be considered an inspection. Permit fees are non-transferable.City of Sacramento · 2019$250