What the public permit record shows, not self-reported reviews.
Is DUNCAN'S ROOFING a real contractor?
DUNCAN'S ROOFING appears in public building-permit records with 16 permits filed through 2026 in and around Sacramento County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is DUNCAN'S ROOFING's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to DUNCAN'S ROOFING by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is DUNCAN'S ROOFING licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. DUNCAN'S ROOFING has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is DUNCAN'S ROOFING's work?
The most recent permit on record for DUNCAN'S ROOFING is dated 2026-05-06, with 16 permits on file in total.
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tearing off current roof and redoing new roofSacramento County · 2026$5,600
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Removing current roof and install new one TPOSacramento County · 2026$18,500
108, 131, or 132 inspection required prior to covering any work; taking off part of the roof that needs to be re-roofed and replacing, This area of the roof is currently leaking,Sacramento County · 2026$33,000
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; We are tearing off the current roof system for the house, garage and ADU and installing a new cool roof systemSacramento County · 2025$34,000
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tear off roof and install new cool roof shinglesSacramento County · 2025$15,900
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tearing off the current roof and installing a new roof
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you DUNCAN'S ROOFING?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to DUNCAN'S ROOFING's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2025
$20,000
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; We are tearing off current roof and installing new cool roof shingle roofSacramento County · 2025$15,900
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Roof to be done with a overlay using cool roof shingles. 6925 Nova PkwySacramento County · 2025$14,900
IN PROGRESS INSP REQUIRED; Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tearing off current roof system and replacing with new roof.Sacramento County · 2025$16,400
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 14 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater.City of Sacramento · 2025$9,000
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 18 squares of 30yr Laminated Dimensional Composition. CRRC: 0668-0116City of Sacramento · 2025$20,500
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 25 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater.City of Sacramento · 2025$19,000
Permitted projects on public record. Addresses are omitted for privacy.