the structural anchoring of moveable steel storage racks (required by Inspector Corrections).Sacramento County · 2023$49,750
CH-01 trash enclosure drainage resolutionSacramento County · 2022
MAIN CASE - Trash enclosure relocation, landscape and hardscape rework to create additional parking spots where existing trash, enclosure is located. SUB CASE CBNC2022-0022 Two (2) new EV charging parking stalls., CH-01 trash enclosure drainage resolutionSacramento County · 2022$37,000
SUBCASE - Two (2) new EV charging parking stalls.
MAIN CASE IS CBNC2022-00201Sacramento County · 2022$8,000
ADA AND FINISH UPGRADES TO THE PUBLIC RESTROOMS, ELEVATORS, AND DRINKING FOUNTAINS.
FINISH UPGRADES TO COMMON CORRIDORS, LOBBY AND STAIRS. WORK OCCURS ON LEVELS 1, 2 & 3.Sacramento County · 2022$2,001,050
Reference Sheet A2: Wall on west side of Breakroom originally noted as an existing 1 hr. rated wall. Upon inspection, it was found that this is not a 1 hr. rated wall, but it does not have to be. No rated walls required between B Occupancy and S-1 Storage area. Inspector requested that the plan be updated to indicate that this is not a rated wall.
EXPEDITE PLEASE!Sacramento County · 2025
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Added a (N) XFMR "TEV2" and (N) Panel "EV2" to site for EV Chargers. Added/Updated panel schedules. Update the One-Line Diagram to reflect the (N) XFMR and (N) panel. Added feeders/voltage drop calcs for the added XFMR and Panel.Sacramento County · 2024
Delta 4 Owner Changes Narrative: Added a (N) XFMR "TM1A" and (N) Panel "M1A" to future office space (For Future Use) with no new load. Added/Updated panel schedules. Updated the One-Line Diagram to reflect the (N) XDMR and (N) Panel. Added feeders/voltage drop calcs for the added XFMR and Panel. Removed two EV Charger Disconnects from the shop floor plan.Sacramento County · 2024
This application is for the structural anchoring of moveable steel storage racks (required by Inspector Corrections).Sacramento County · 2023
This is a DEFERRED SUBMITTAL for the "Finwall System."Sacramento County · 2022$68,000
Our permit for this project was recently issued. Eugene Balinski, with the Dept. of Water Resources, allowed the permit to be issued while we developed a trash enclosure drainage resolution for this project. He put a FINAL HOLD under the original permit number until we have this revision approved. This revision is for submission of these plans to resolve the Hold.Sacramento County · 2022$15,000
DELTA 5 REVISION. Relocate Door 146D to adjacent CMU wall and create hallway in Service Storage 147 for access from Shop 137 to Wash/Detail 146. Added structural sheet S7.22 for Trash Enclosure details and corresponding structural calculations. Revise Continuous Footing Schedule S1.31. Along with the attached Architect's narrative, we are including revised Delta 5 drawings and structural calculations dated 8/31/2022 for your review.Sacramento County · 2022$8,500