*Sub out core bore threw pan deck to supply hole access for (3) new kiosks
*Remove 3 existing kiosks, bring power & data back to box and safe off
*Install 3 kiosks and extend power and data from existing kiosks to new kiosks
*Patch holes in existing terrazzo. Strip & reseal affected panels to blend patches
Relocation of (3) CLEAR Kiosks in SMF Terminal B & supporting infrastructure, as requested by SMF Airport OperationsSacramento County · 2025$20,000
Remove 200-amp Zinsco panel and replace with 200-amp Siemens panelSacramento County · 2025$5,000
Address is 4219 Antelope Seventh Day Adventist church
Changing Electrical Main breakerSacramento County · 2025$5,500
Demolition of existing switch gear and install new switch gear. Make all connections to all new conductors to new switch gear. Like for Like, 1000A - Jesuit High SchoolSacramento County · 2025$47,227
Work within existing airport spaces. Installation of a total of 8 floor mounted CLEAR PODS in various areas of terminal A.
Electrical and data connections to CLEAR POD floor mounted locations. Scan and core/drill work for items noted above. Some
layout changes to queuing lines. Replaced CBAC2021-00001. Child cases CBAC2021-00050 and CBAC2021-00051 shared plans.Sacramento County · 2025$17,142
Work within existing airport spaces. Installation of a total of 10 floor mounted CLEAR PODS in various areas of terminal B Airside. Electrical and data connections to CLEAR POD floor mounted locations. Scan and core/drill work for items noted above. Some layout changes to queuing lines. Parent case CBAC2021-00054 shared plans
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2025
$21,428
3,247.2 kW DC photovoltaic roof mounted system on Amazon buildingSacramento County · 2022$3,500,000
Interior build out of breakroom/office space for Clear Me in Sacramento County Airport.Sacramento County · 2021$125,000
Work within existing airport spaces. Installation of a total of 3 floor mounted CLEAR PODS in various areas of terminal B, Landside. Electrical and data connections to CLEAR POD floor mounted locations. Scan and core/drill work for items noted above. Some layout changes to queuing lines. Parent case CBAC2021-00054 shared plans.Sacramento County · 2021$6,428
Reinstallation of roof mounted PV with increase number of anchors after a wind eventCity of Sacramento · 2024
EPC - Temporary Power to jobsite trailers for Army Corp of Engineers.City of Sacramento · 2023$50,000
3,247.2 kw DC photovoltaic roof mounted system on Amazon BuildingCity of Sacramento · 2021