What the public permit record shows, not self-reported reviews.
Is BARKER CONTRACTING INC a real contractor?
BARKER CONTRACTING INC appears in public building-permit records with 15 permits filed through 2024 in and around Sacramento County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BARKER CONTRACTING INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BARKER CONTRACTING INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BARKER CONTRACTING INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BARKER CONTRACTING INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BARKER CONTRACTING INC's work?
The most recent permit on record for BARKER CONTRACTING INC is dated 2024-06-07, with 15 permits on file in total.
SUPPLEMENTAL SHELVING PERMIT FOR COMMERCIAL TENANT IMPROVEMENT PERMIT #CBAC2022-00523. CSL PLASMA.Sacramento County · 2024$11,900
CH07 - additional data and power to trash enclosure and existing.
parking lot.Sacramento County · 2024
THE PROJECT WORK INCLUDES INTERIOR DEMOLITION AND COMPLETE RENOVATION OF THE EXISTING STAND-ALONE BUILDING FOR A 12,928 SQ. FT. BLOOD PLASMA COLLECTION FACILITY, GROUP B, BUSINESS USE. THE PREVIOUS USE WAS GROUP M, MERCANTILE USE. SINGLE STORY, TYPE III-B CONSTRUCTION, FULLY SPRINKLERED.
OSPHD III CERTIFICATION IS NOT REQUIRED FOR THIS FACILITY., CH-01 Construction revisions pertain to floor slab, existing roof framing, dimension plan, exterior elevations, wall types, casework, door/window schedule, interior signage, fire protection plan, and mechanical, plumbing and electrical accordingly., CH-02 (2) NEW PRE-ENGINEERED, PRE-FINISHED METAL PANEL AWNINGS & AWNING FRAMES FOR CSL PLASMA T.I., CH-03 INSTALL ONE (3) COMPARTMENT WALK-IN FREEZER AND THEIR RELATED COMPONENT. AP-26. scanned to the case for electric, CH04, CH05 - RFI #75: Exterior Elevations at door 148A - 1) Revised the landing, ramps and sidewalks leading to door 148A. 2) Revised accessible parking space locations.
RFI #78: New Column at 0.9-B - 1) Provided revised column footing detail.
RFI #79: New LVLs at joist repair - 1) Revised detail 5/S105., CH-06 - SITE ACCESSIBILITY REQUIREMENTS SUPPLEMENTAL CHANGE TO FRONT ENTRANCE., CH067 - additional data and power to trash enclosure and existing.
parking lot.Sacramento County · 2024$2,070,018
CH-06 - SITE ACCESSIBILITY REQUIREMENTS SUPPLEMENTAL CHANGE TO FRONT ENTRANCE.Sacramento County · 2024
CH05 - RFI #75: Exterior Elevations at door 148A - 1) Revised the landing, ramps and sidewalks leading to door 148A. 2) Revised accessible parking space locations.
RFI #78: New Column at 0.9-B - 1) Provided revised column footing detail.
RFI #79: New LVLs at joist repair - 1) Revised detail 5/S105.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BARKER CONTRACTING INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to BARKER CONTRACTING INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2024
CH04 - BLDG COLUMN FOOTING LINE B AND LACK THEREOF @ FOUNDATION. ADDED NEW FOUNDATION @ EXISTING COLUMN B-4. DEFERRED SUBMITTALS TRANSFORMER PAD & IT'S MOUNTING ANCHORAGE. REMOVED SOME DEFERRED SUBMITTALS. EXISTING 2 COLUMNS B/1 & 2 TO BE REMOVED AND NEW ONES INSTALLED HAS CONCRETE BOND BEAM ATTACHED & RUNNING THRU THEM. UPDATED (E) FOUNDATION LAYOUT AT NEW COLUMNS B0.9 & B1.8.Sacramento County · 2023
CH-03 INSTALL ONE (3) COMPARTMENT WALK-IN FREEZER AND THEIR RELATED COMPONENT.Sacramento County · 2023
CH-01 Construction revisions pertain to floor slab, existing roof framing, dimension plan, exterior elevations, wall types, casework, door/window schedule, interior signage, fire protection plan, and mechanical, plumbing and electrical accordingly.Sacramento County · 2023
CH-02 (2) NEW PRE-ENGINEERED, PRE-FINISHED METAL PANEL AWNINGS & AWNING FRAMES FOR CSL PLASMA T.I.Sacramento County · 2023
Supplemental Change Permit: This CR was issued to address: additional data and power to trash enclosure and existing
parking lot.Sacramento County · 2024
CH-06 - SITE ACCESSIBILITY REQUIREMENTS SUPPLEMENTAL CHANGE TO FRONT ENTRANCE.Sacramento County · 2024
RFI #75: Exterior Elevations at door 148A - 1) Revised the landing, ramps and sidewalks leading to door 148A. 2) Revised accessible parking space locations.
RFI #78: New Column at 0.9-B - 1) Provided revised column footing detail.
RFI #79: New LVLs at joist repair - 1) Revised detail 5/S105.Sacramento County · 2023
Permitted projects on public record. Addresses are omitted for privacy.