(Main-case to CBNC2024-00321) - The scope of work for this permit includes the installation of:
- 55'x20' shade shelter with attached lighting
- 32'x24' shade shelter
- 12'x10' shade shelter
- 20'x15' shade shelter
- Drinking fountain
- EV charging stations (separate permit)
- Lighting
- Pool deck replacement
- Outdoor showers
- 10' tall tubular steel pool fencing
- 8' tall chain link fencing
- Trash enclosure
- Vehicular entry gates
Fruitridge Park Renovation
(Subcase = CBNC2024-00321)
***SEND TO COM*** REV01 Revision to the anchor bolting pattern for the 15' x 20' shelter. REV02 Changes were made to the 32'x24' shade structure footer section to account for variations in the surface grade. This allows the shade structure to be level while the surrounding flatwork is gently sloped. These changes are reflected in updated details in Sheets L1.11. Change to Installation of shade shelter in public park.Sacramento County · 2026$630,200
(Sub-case to CBNC2024-00293) - The scope of work for this permit includes the installation of:
- Two (2) dual Level 2 EV charging stations (serves 4 parking stalls)
Fruitridge Park RenovationSacramento County · 2025$72,300
Installation of sports lighting and path lighting. Running electrical for the irrigation system., CH-01 - Installation of sports lights and pathway lighting.Sacramento County · 2025$1,150,000
CH-01 - Installation of sports lights and pathway lighting.Sacramento County · 2025
Installation of a prefabricated restroom building within an existing park. The project had the utilities previously stubbed with water, sewer, and electrical at pull boxes in anticipation of the restroom building.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2024
$290,000
Install 1020 sf shade structure. THIS IS A SHARED SET OF PLANS WITH CBNC2022-00255.Sacramento County · 2023$73,970
Replace old restroom building with new pre-fabricated restroom building at an existing park. Utilities for the restroom building already exist within new building footprint. Reroute existing electrical to restroom electrical panel, shelter light and outlets. THE SCOPE OF CBNC2022-00483 IS INCLUDED ON THE PLANS OF CBNC2022-00255.Sacramento County · 2023$49,000
Project will renovate the pool mechanical room structure, equipment, and supporting utilities.Sacramento County · 2025$500,000
CH-01 - Installation of sports lights and pathway lighting.Sacramento County · 2024
EPC - Project includes updates to the existing play area within the property lines. A new single-story wood framed building of approximately 240 S.F. will be constructed within the play area for office use.City of Sacramento · 2024$500,000
The revised footer only affects the fence posts on the eastern perimeter along the bioswale feature.Sacramento County · 2024
EPC - Installation of one (1) fabric shade canopy for Northlake Community Park. The shade canopy has a foot print of 784 sf with four (4) footings, a steel frame and a fabric shade canopy. See COM-2124073 for structure location.City of Sacramento · 2022$94,000
Permitted projects on public record. Addresses are omitted for privacy.