NEW DETACHED ADU - 842 SQ. FT - 2 BEDROOM / 2 BATHROOMSacramento County · 2026$144,576
EXPEDITE - BUILD NEW DETACHED ADU TO BE ONE STORY & TOTAL SIZE OF 1,045 SQ. FT.Sacramento County · 2025$173,554
EXPEDITE - BUILD NEW DETACHED STORAGE ROOM WITH HALF BATH. TOTAL OF 444 SQ. FT.Sacramento County · 2025$29,517
Expedite 1- Add new full bath of 75 sq. ft.
2- Addition of 800 sq. ft.
3- Add attached patio coverSacramento County · 2025$161,135
Demo permits include structure and foundation/flat work only. No grading is included with this permit.; Demo permit: Remove fire damaged materials, debris, collapsed roof, open structure for a structural assessment.Sacramento County · 2025$34,000
Fire repair, replace insulations, replace fire-damaged wires, Replace drywalls and any damaged windows, and fresh paint. Kitchen and bathroom fire repair. replace flooring. Replace and repair damaged siding and roof. Remove separation wall between master bedroom and bedroom 2, to create new master suite. Remove and frame in existing hallway door to master, and existing door from dining room to master bath.Sacramento County · 2024$169,000
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Change 01: Electric Work and Re-Wire the houseSacramento County · 2022
DEMOLISH EXISTING GARAGE & ROOMS AS SHON ON PLANS (962 SF) / ADD NEW 33 SQ.FT / BUILD NEW 1 CAR GARAGE (245 SF)/ REROOF THE WHOLE HOUSE / REPLACE EXTERIOR SIDING WITH NEW STUCCO SYSTEM. PER PLANS: RELOCATE WATER HEATER/UPGRADE MSP T 200 AMP/NEW SPLIT HVAC SYSTEM/REMODEL BATH/RECONFIGURE BEDROOMS/CLOSETS., Change 01: Electric Work and Re-Wire the houseSacramento County · 2022$104,000
IN PROGRESS INSP REQUIRED; Replacing old composite shingle roof with new composite shinglesSacramento County · 2022$5,175
Ch-01 - Kitchen Remodel, upgrade bathroom, upgrade 200A electrical panel, taking siding off of whole house and replace stucco, while also changing up the whole roof from old comp shingle to new comp shingle.Sacramento County · 2022
Upgrade 200A electrical panel, taking siding off of whole house and replace with stucco, while also changing up the whole roof from old comp shingle to new comp shingle., Ch-01 - Kitchen Remodel, upgrade bathroom, upgrade 200A electrical panel, taking siding off of whole house and replace stucco, while also changing up the whole roof from old comp shingle to new comp shingle.Sacramento County · 2022$65,020
upgrade electrical panel to 200aSacramento County · 2022
Permitted projects on public record. Addresses are omitted for privacy.