remove existing 100Amp panel and upgrade it to a 200Amp new panel.Marin County · 2025$3,800
We will be mounting a new 200amp panel approximately 3 inches to the left of the existing 100Amp panel. This will be a surface mount. we will then use the old panel as a junction box. We will drive (2) ground rods, run new ground wire between them and into the new panel. Run a ground wire at the hot water heater from the hot, cold and to gas.Marin County · 2024$4,100
We will be changing a main panel. Scope of Work: Install a new panel 36 away from the old panel and gas. Install new weather head, and main wire feeds. relocate all circuits.Marin County · 2023$3,800
Addition of a hot tub out in back yard. Also a Meter main panel changeMarin County · 2023$6,500
To remove old Zinsco 100Amp meter main panel and replace it with a new meter 200AMP panel with main breaker.Marin County · 2022$3,800
We would like to change out the main panel. Old one has pitted bus bar.Marin County · 2020$3,200
Area served
City of Sacramento, City of Vallejo, Marin County
Are you THEISS ELECTRIC INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
upgrade main panel to 200A. run new line out to new hot tub
Marin County · 2019
$5,350
Installing new EV charge and plug for chargerMarin County · 2019$954
Install new 200 amp, riser conduit & wire feed, second grounding rod for code wire, run conduit and wire to re-power sub panel, install water/gas bonding surface mounted meter main panel on same wall as existing meter.Marin County · 2019$2,650
Change main panel like for likeMarin County · 2019$3,600
Installing electrical spa box.Marin County · 2018$2,500
We will be removing (2) Fuse Panel in the interior of unit A. We will be removing (4) exterior 60Amp Zinsco style sub panels and replacing them with a "Like for Like" 60Amp Sub panel. We will be working with the 2022 California Electrical Code, as well as NECCA 2022 and all municipal codes.City of Sacramento · 2024$13,080
Permitted projects on public record. Addresses are omitted for privacy.