What the public permit record shows, not self-reported reviews.
Is SONOMA MARIN ELECTRIC INC a real contractor?
SONOMA MARIN ELECTRIC INC appears in public building-permit records with 10 permits filed through 2026 in and around Marin County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SONOMA MARIN ELECTRIC INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SONOMA MARIN ELECTRIC INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SONOMA MARIN ELECTRIC INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SONOMA MARIN ELECTRIC INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SONOMA MARIN ELECTRIC INC's work?
The most recent permit on record for SONOMA MARIN ELECTRIC INC is dated 2026-01-12, with 10 permits on file in total.
Recent permitted projects
adding electrical for sewer pumps as part of Bayside Acres Sewer Relocation Project Phase 3BMarin County · 2026$10,000
Furnish and install new electrical infrastructure for the Bayside Acres Phase 2B projectMarin County · 2025$10,000
Furnish and Install new MSP and electrical infrastructure for the Bayside Acres Phase 2B sewer projectMarin County · 2025$10,000
Furnish and install new electrical infrastructure for the Bayside Acres Phase 2B sewer projectMarin County · 2025$10,000
Furnish and install new electrical infrastructure for the Bayside Acres Phase 2B projectMarin County · 2025$10,000
Install new MSP and other electrical devices, conduit, and wiring for the Bayside Acres Phase 2B sewer relocation projectMarin County · 2025$10,000
Bayside Acres Sewer Relocation Project - install new conduit and conductors for sewer pump and pump controller, MTS and new sub panelMarin County · 2024
Area served
Marin County
Use this data — free
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SONOMA MARIN ELECTRIC INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SONOMA MARIN ELECTRIC INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$11,000
Bayside Acres Sewer Relocation Project - electrical permit for new sewer pump and control panel and MTSMarin County · 2024$7,000
Bayside Acres Sewer Relocation Project - install conduit and conductors for new sewer pump and controller, and MTSMarin County · 2024$9,000
existing site conditions include 30kw propane powered generator, 500g propane tank, and 200 amp automatic transfer switch.
scope of work includes removing existing generator and ATS and install new Kohler 30RCL generator and Kohler RDT 200 amp transfer switch. standby system to be connected to existing premise wiring in same manner, as too provide backup power to entire building during outageMarin County · 2021$30,000
Permitted projects on public record. Addresses are omitted for privacy.