What the public permit record shows, not self-reported reviews.
Is MARTINELLI ELECTRIC a real contractor?
MARTINELLI ELECTRIC appears in public building-permit records with 12 permits filed through 2026 in and around Marin County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MARTINELLI ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MARTINELLI ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MARTINELLI ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MARTINELLI ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MARTINELLI ELECTRIC's work?
The most recent permit on record for MARTINELLI ELECTRIC is dated 2026-06-11, with 12 permits on file in total.
Recent permitted projects
otherMarin County · 2026$2,000
Update and replace electrical wiring, fixtures and receptacles on 2nd and third level of barn. All new electrical work wiring will be exposed and installed in EMT conduit. Install (1) 100 amp sub panel and (1) 50 amp sub panel on 2nd level.Marin County · 2025$60,000
Replace existing 200 amp electrical service feeding (2) 100 amp electrical meters with new 320 amp service with (2) 200 amp meters in existing location. Add new 50 amp EV charger next to electrical service.Marin County · 2025$10,000
Replace existing 100 amp barn electrical sub panel with new 200 amp panel and underground conduit and feeder. Under ground conduit will be approximately 250 ft from existing electrical service to barn.Marin County · 2025$10,000
Replace Existing garage sub panel with new panel in same location. no increase to amperage. Install 240 volt 30 amp circuit for new heat pump.Marin County · 2025$3,000
Replace existing 200 amp Zinsco Electrical service panel with new 200 amp service in the same location.
make misc. repairs to an additional electrical panel on the same wall.Marin County · 2024$5,000
Area served
Marin County
Use this data — free
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MARTINELLI ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MARTINELLI ELECTRIC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Install 18 KWH Battery Backup system for well pump and fire sprinkler pump, as well as critical residential circuits. Batteries Inverter and Transfer switch will be installed remotely next to the existing electrical service.Marin County · 2023$30,000
Install new 200 amp electrical service on main house. Separate from agricultural electrical meter fed from the barn.Marin County · 2023$7,500
Install new 200 amp Electrical service on main house. House electrical is currently being power from an agricultural meter on the barn and needs to be separated from that meter.Marin County · 2023$7,500
Replace existing 100 amp electrical service with new 200 amp Service in existing location. Install new sub panel on other side of the wall. Install 100 amp transfer switch for future standby generator.Marin County · 2021$6,200
Replace existing sub panel for existing trailer and septic system. Old panel is corroded and unserviceable.Marin County · 2021$4,000
Replace existing 200 amp 3 phase electrical service with new 200 amp service in similar location. Existing service and Meter are located inside the barn. the new electrical service will be located on the exterior of the same wall.Marin County · 2020$5,000
Permitted projects on public record. Addresses are omitted for privacy.