What the public permit record shows, not self-reported reviews.
Is EVCHARGE4U INC a real contractor?
EVCHARGE4U INC appears in public building-permit records with 11 permits filed through 2024 in and around Marin County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is EVCHARGE4U INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to EVCHARGE4U INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is EVCHARGE4U INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. EVCHARGE4U INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is EVCHARGE4U INC's work?
The most recent permit on record for EVCHARGE4U INC is dated 2024-12-19, with 11 permits on file in total.
Recent permitted projects
INSTALL (2) 240V-48A WIFI ENABLED ZEROVA 48AMP EV CHARGERS TO BE ASSIGNED TO THE
PARKING SPACES OF GUESTS AND/OR STAFF. INSTALL A NEW 240V-90A SUB PANEL FROM METER MAIN. AND (1) 240V-60A TWO-POLE CIRCUIT BREAKER ON NEW SUB PANEL TO SUPPLY POWER FOR (2) LOAD-MANAGED EVSE. OUR RACEWAY IS EXISTING PVC CONDUIT TRENCHED 24” DEEP WITH #6AWG COPPER FEEDERS AND #10AWG COPPER EQUIPMENT GROUND.Marin County · 2024$20,000
Install 240V-60A EVSE from the Main Panel. Our raceway is 15LF of surface mounted 1” EMT conduit with #6awg copper wire feeders and #8awg equipment ground.Marin County · 2024$1,400
Install Tesla Wall Connector with Neurio Load Management 240V-15amp located on the interior of the garage on a dedicated 240V-50amp circuit from the 240V-100amp Main Panel. Our raceway is 1” EMT Conduit with #6awg copper wire feeders with #8awg equipment ground.Marin County · 2024$1,300
Install Tesla Wall Connector in parking space #5 behind a DCC Load Management System on a dedicated circuit (240V-50amp). Our raceway is surface mounted 1” EMT with #6 AWG copper as feeders.Marin County · 2021$2,400
Install Tesla Wall Connector (provided by client) dedicated
240V-60amp from your Main Panel with 23LF of surface
mounted 1in. EMT conduit. Our raceway is a surface
mounted one-inc Electrical Metal Tubing (EMT), with #6 AWG copper wire.Marin County · 2020$1,200
Area served
City of Vallejo, Marin County
Use this data — free
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you EVCHARGE4U INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Install a hardwired ChargePoint Flex behind a DCC Load Management System on a dedicated 240V-50amp circuit with roughly 110LF of surface-mounted 1in EMT #6AWG Copper.Marin County · 2020
$4,500
Installing new 14-50 receptacle on a dedicated 240 v-50 amp circuit.Marin County · 2018$1,188
INSTALLING ELECTRIC CAR CHARGERMarin County · 2017$1,674
otherCity of Vallejo
otherCity of Vallejo
otherCity of Vallejo
Permitted projects on public record. Addresses are omitted for privacy.