Cross street: PASEO DE LA FUENTE
Description of Work: MISC ELECTRICAL FOR CONDUIT FOR "GATEWAY ENERGY STORAGE"San Diego County · 2023
Cross street: PASEO DE LA FUENTE
Description of Work: SUBSTATION EXPANSION FOR "GATEWAY ENERGY STORAGE" TO INCLUDE STEEL INFRASTRUCTURE SUPPORT STRUCTURES, (1) 65' STATIC MAST, (1) 50' STATIC MAST, (4) 10' LIGHTNING RODS ABOVE SUPPORT STRUCTURES (TOP OF ROD ~34'), INSTALL RACKING IN EXISTING ENCLOSURE, INSTALL IAR INSULATED EQUIPEMENT (BREAKERS, SWITCHES, INSULATORS), MANUAL ENTRY GATE AND PERIMETER FENCING (MAX HEIGHT 8 LF), GROUND AND SITE LIGHTING FOR PROPOSED SUBSTATION
(PROPOSED SUBSTATION UNDER RECORD ID PDS2022-COMPRI-000038)San Diego County · 2023
WORKING WITH PG&E ON THE PUBLIC SAFETY POWER SHUTDOWNS. WE ARE INSTALLING AN AUTOMATIC TRANSFER SWITCH TO PROVIDE POWER TO A TEMPORARY PORTABLE GENERATOR.Marin County · 2020$76,652
Install 22 E V Chargers W/11 Dual Port Chargers; 600 A Main And T.D.Marin County · 2019$180,000
Tenant ImprovementCity of San Jose · 2019$20,000
Tenant ImprovementCity of San Jose · 2019$20,000
Tenant Improvement
Area served
City of Sacramento, City of San Jose, Marin County, San Diego County
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of San Jose · 2018
Installing 14 Ev Chrging Stations
T.D. 11/14/18Marin County · 2018$261,000
17 E V Charger Stations @ Far West Pkg Area
T.D. 6/25/18Marin County · 2018$142,045
17 E V Charger Stations @ The Pit
T.D. 6/25/18Marin County · 2018$482,955
Add Master Suite To 2nd Unit; Railings Upgr To Code T.D. 1/24/18Marin County · 2018$120,000
EXPEDITED - EPC - INSTALL ELECTRIC VEHICLE INFRASTRUCTURE TO SUPPORT 110 CHARGE PORTS ASSIGNED FOR FLEET CHARGING ONLY.
A TOTAL OF (42) 19.2KW AC LEVEL 2 PORTS, (4) 22.5KW DC WALLBOX PORTS, (6) 92KW DCFC PORTS AND ASSOCIATED ELECTRICAL EQUIPMENT WILL BE INSTALLED. ADDITIONALLY, CONDUITS AND FOUNDATIONS WILL BE INSTALLED FOR FUTURE INSTALLATION OF (42) 19.2KW AC WALLBOX LEVEL 2 PORTS, (16) 22.5KW DC WALLBOX PORTS, AND ASSOCIATED ELECTRICAL EQUIPMENT.
ELECTRIC VEHICLE CHARGING STATIONS SHALL NOT BE AVAILABLE TO THE GENERAL PUBLIC AND ARE INTENDED FOR USE BY A DESIGNATED VEHICLE. PURSUANT TO CALIFORNIA BUILDING CODE SECTION 11B-228.3.2. THEREFORE, NO ACCESSIBLE EVSE PARKING STALLS WILL BE INSTALLED.
revision COM-2406946 Updated connections to Nexus Equipment (Powerflex Load Management Equipment).
Additionally, other programmatic changes have been added including added bollards for chargers in specific parking areas, mount type for panelboards, additional access points and tap box for future generation tie-in.City of Sacramento · 2023$516,225