Tenant ImprovementCity of San Jose · 2020$1,700,000
Tenant ImprovementCity of San Jose · 2019$2,500,000
EPC - This project upgrades site security at the primary building entrance by adding an interior man trap and upgrades site security at the secondary entrance by upgrading the access control and various other components.City of Sacramento · 2024$200,000
EPC - Exterior and interior renovation, adding walk-in cooler, roll-up door along R-Corridor. Install concrete pavement for food truck delivery access in loading goods. Upgrade HVAC units above roof.City of Sacramento · 2024$50,000
EXPEDITED - EOTC: Merge (1) small existing laboratory into (1) larger laboratory, approximately 332 SF total. Demolition of (3) walls with minor plumbing, mechanical, electrical, and update of finishes.City of Sacramento · 2024$150,000
EOTC - EXPEDITED - Converting existing conference room into health office exam room. Minor electrical, adding sink, cabinet, changing out flooring, and the door
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Sacramento · 2023
$80,000
Replacement of burst water service line in adjacent parking lot. Demo 90' of existing asphalt. Excavate trench for new 1 1/4" line from meter to building. Replace and re-compact native backfill, repair affected asphalt paving. Water service piping for River City Food Bank at 1800 28th. Parking lot where work will take place has the address of 1814 and 1810 28th St. Encroachment Permit required for work in public right of way.City of Sacramento · 2023$2,000
EPC - THE SCOPE OF WORK IS A REPLACEMENT AND EXTENSION OF THE WOOD-FRAMED CANOPY AT THE MUSTARD SEED SCHOOL, NO CHANGE TO THE FOOTPRINT NEW 407 SQ FT CANOPYCity of Sacramento · 2023$14,042
EPC - Replacement of existing surface parking with accessible parking lot improvements. The disturbed area is approximately 2,802 square feet.City of Sacramento · 2023$75,000
EPC - Install new casework and install new data port, and lower existing power/data in the MOB II Conference Rms. ABC. Install new truncated domes at accessible parking stalls, Replace existing truncated domes at curb ramps and loading zone near the MOB II Building. New guard rail. Total area of work: 5,500 Sq. ft. (Interior: 75 sq.ft. / Exterior: 5,425 sq.ft.)City of Sacramento · 2020$150,000
SUITE # 510 - SMUD Safety Inspection. One time inspection only. Additional inspections will cost $76.00 (Residential) or $152 (Commercial) each. If there is no access to the site or areas required by an inspector this is still an inspection. Permit fees are non-transferable.( CUSTOMER TO PROVIDE PLANS FROM COM-17218986 FOR REFERENCE)City of Sacramento · 2019
Permitted projects on public record. Addresses are omitted for privacy.