Install approx 20ft of 3/4 EMT with (3)#8 wire and (1)#10 wire. Install 14/50 receptacle and NEMA 3 box on inside of garage. Add 40amp 240v breaker in existing sub panel in garage.Sacramento County · 2021$779
:Remove existing main panel. Install new 125amp panel in new location per SMUD. Install grounding and bonding.Sacramento County · 2021$1,500
Remove existing 200amp main panel. Install new 200amp main panel, grounding and bondingSacramento County · 2021$2,300
Replacing existing 100amp main panel with 200amp main panelSacramento County · 2021$2,300
E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, Replacement weather head/masthead work, main breaker replacement.City of Sacramento · 2021$2,501
Replacing existing 100amp main panel with 200amp main panelSacramento County · 2021$2,300
EPC - Replace existing propane generator, ATS and MTS with new diesel generator, ATS and MTS: Diesel Generator is a 50 kw -Model # SDO050; Auto Transfer Switch installation @ 200A with a Manual Transfer switch
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Sacramento · 2021
$31,950
AA: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement, adding 100 Amps subpanel.City of Sacramento · 2019$3,531
Change out existing 200amp electrical panel for new 200amp electrical panel. Like for like change out.City of Sacramento · 2018$1,000
UPGRADE MAIN SERVICE FROM 100A TO 200A. RELOCATE METER 10FT PER PG&E CORRECTIONS existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314City of Sacramento · 2018$2,800