Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Regular reroof with tearoff. New deck, comp to comp. 18sqSacramento County · 2026$5,000
108, 131, or 132 inspection required prior to covering any work; Overlay existing roof with 60 mil tpo Mechanically fastened.Sacramento County · 2026$60,000
Tear off, install new COOL roofSacramento County · 2026$14,000
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tear off old shingles, dryrot repair if needed, installing new COOL Rood shingles.Sacramento County · 2026$15,000
108, 131, or 132 inspection required prior to covering any work; Remove 16 sq existing roof, install new 7/16 osb, install sbs modified bitumen systemSacramento County · 2026$20,000
Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Remove existing roof and install 60 mil tpo mechanically fastenedSacramento County · 2026$8,000
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
SUBJECT TO FIELD APPROVAL -
108, 131, or 132 inspection required prior to covering any work; Roof overlay with 60 mil tpo
Roof overlaySacramento County · 2026$22,000
IN PROGRESS INSP REQUIRED; Tear off old shingles, dry rot repair if needed, installing new COOL Roof shinglesSacramento County · 2025$13,000
108, 131, or 132 inspection required prior to covering any work; Tpo overlay with fanfold 0.5” insulationSacramento County · 2025$14,000
IN PROGRESS INSP REQUIRED; Tear Off old Shingles, dry rot repair if needed, installing new COOL Roof shinglesSacramento County · 2025$15,000
108, 131, or 132 inspection required prior to covering any work; Tear off old shingles, dry rot repair if needed, instaling new 60 MIL TPOSacramento County · 2025$18,800
108, 131, or 132 inspection required prior to covering any work; Tear off old Roof install new TPO 60 Mil
ReroofSacramento County · 2025$70,000
Permitted projects on public record. Addresses are omitted for privacy.