What the public permit record shows, not self-reported reviews.
Is UNGER CONSTRUCTION CO a real contractor?
UNGER CONSTRUCTION CO appears in public building-permit records with 73 permits filed through 2026 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is UNGER CONSTRUCTION CO's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to UNGER CONSTRUCTION CO by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is UNGER CONSTRUCTION CO licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. UNGER CONSTRUCTION CO has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is UNGER CONSTRUCTION CO's work?
The most recent permit on record for UNGER CONSTRUCTION CO is dated 2026-05-12, with 73 permits on file in total.
(MAIN FOR CBNC2024-00127 THRU CBNC2024-00131) 18,500 GSF, 1-STORY ENCLOSED BUILDING USES INCLUDE OFFICES, CAMPUS RECEPTION/STUDENT CHECK-IN, STUDENT DINING, INSTRUCTOR LOUNGE, AND SUPPORTING RESTROOMS, ELECTRICAL/TELECOMMUNICATION, ETC.
TRASH ENCLOSURE, SITE LIGHTING, ELECTRICAL SERVICE REV01 This bulletin#1 compiles drawing changes made to date since the building permit (CBNC2024-00120) was issued. These revisions have been issued to the contractor as part of the Contract Documents as separate Request for Information (RFI) responses and as Architectural Supplemental Information (ASI’s). Revision details are thoroughly noted within uploaded Bulletin#1 narrative and revision checklists noting revisions per sheet number are also included. REV04 An exterior wall that was originally supported by the pre-engineered metal building system (columns and girts) was changed to be supported by light gauge metal framing. REV02 The drawing cover sheet G0.00 lists Fire Water Tanks/Pump as a deferred Submittal. This has been removed as they are being submitted as a separate permit CBNC2025-00313.
- Add "Non-Structural Metal Framing" as Deferred Submittal. DEF03 Non-structural Metal Framing is concurrently being added to the list on the drawing cover sheet via CBNC2024-00120-REV02. This is the deferred submittal including drawings and structural calcs. DEF04 The mechanical contractor submitted structural calculations and associated drawings for the mounting of HVAC equipment, ducts, and pipes.
Shown on approved plans under CBNC2024-00120-REV02Sacramento County · 2026$3,921,592
The umbrella project is CBNC2024-00120. This sub-permit is for a fire water tank to supply the fire protection systems in the Admin, Classroom, HDR, and Vehicle Maintenance buildingsSacramento County · 2026$100,000
The umbrella project is CBCN2024-00120, OE3 Training Center. This permit is to add a landscape water tank for the irrigation system. (The fire water tank was submitted separately)Sacramento County · 2026$10,000
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you UNGER CONSTRUCTION CO?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to UNGER CONSTRUCTION CO's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
(SUB-CASE TO CBNC2024-00120)
• 12,500 GSF, 1-STORY ENCLOSED BUILDING
• 960 GSF COVERED OUTDOOR BREEZEWAY
• USES INCLUDE LARGE AND SMALL CLASSROOMS, A SIMULATOR TRAINING ROOM,
AND SUPPORTING RESTROOMS, ELECTRICAL/TELECOMMUNICATION, ETC.Sacramento County · 2025
$2,529,854
(SUB TO CBNC2024-00120) • 10,860 GSF, 1-STORY ENCLOSED BUILDING
• 2,400 GSF COVERED OUTDOOR WASH RACK AREA
• USES INCLUDE VEHICLE MAINTENANCE BAYS, SUPPORTING OFFICES AND TOOL
ROOM, A COVERED OUTDOOR WASH RACK AREA, AND SUPPORTING RESTROOMS,
ELECTRICAL/TELECOMMUNICATION, ETC.Sacramento County · 2025$1,205,738
(SUB TO CBNC2024-00120) • 14,560 GSF, 1-STORY ENCLOSED BUILDING
• 5,050 GSF COVERED OUTDOOR WORK AREA
• USES INCLUDE CLASSROOMS, SUPPORTING OFFICES, A MACHINE/ ENGINE SHOP, A
FACILITIES MAINTENANCE SHOP, A COVERED OUTDOOR WELDING AND MATERIALS
STORAGE AREA AND SUPPORTING RESTROOMS, ELECTRICAL/TELECOMMUNICATION,
ETC. & TRASH ENCLOSURESacramento County · 2025$2,334,773
(SUB TO CBNC2024-00120) Parking area EVSacramento County · 2025$1
(SUB TO CBNC2024-00120) Fuel storage areaSacramento County · 2025$580,000
75,600 GSF Shade Structure for Protected Heavy Equipment TrainingSacramento County · 2025$5,300,000
Converted from MISC2023-00065 - Transmitter Building Structural Column(s) Repairs. Identified as three columns, see plans for further detail.Sacramento County · 2023$20,000
Original proposed slope walk exceeded 5% from accessible parking stall to main entry. Needed to lengthen walk. Also added stairs & handrails per owners requestSacramento County · 2022
Remove and replace existing storefront throughout entire building. Update north facing facade including new canopy. Update width of entrance, concrete walkway, respripe accessible stalls at main entry, and remount accessible parking signs to meet requirements. Install new electric outlets under new storefront system. Total remodel is 67 square feet., CH-01 - This is for the review of the aluminum canopy which is a deferred submittal item for approved permit CBAC2022-00164., nullSacramento County · 2022$610,000
Permitted projects on public record. Addresses are omitted for privacy.