What the public permit record shows, not self-reported reviews.
Is UNDERGROUND CONSTRUCTION CO INC a real contractor?
UNDERGROUND CONSTRUCTION CO INC appears in public building-permit records with 26 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is UNDERGROUND CONSTRUCTION CO INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to UNDERGROUND CONSTRUCTION CO INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is UNDERGROUND CONSTRUCTION CO INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. UNDERGROUND CONSTRUCTION CO INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is UNDERGROUND CONSTRUCTION CO INC's work?
The most recent permit on record for UNDERGROUND CONSTRUCTION CO INC is dated 2025-08-19, with 26 permits on file in total.
Recent permitted projects
Installation of a 4th Aboveground API 653 storage tank, containment wall, and minor site and piping improvements at the existing tank farm facility. DEF03 Please see attached drawings and calculations for new fuel tank-4. Light pole anchorage details to follow at a later date.
SubNo.0181.1A_PE Design-Aboveground Vertical Tank Calculations
SubNo.0181.1B.R1_Tank Shop Drawings DEF04 Deferred Submittal for Light Pole Anchorage Details DEF05 Deferred Submittal for Tank Handrail DesignSacramento County · 2025$10,000,000
Replace house gas piping to facilitate new gas meter location for PG&E.Marin County · 2018$1,000
Relocate house gas piping to facilitate new PG&E gas meter location.Marin County · 2018$1,000
Please see attached drawings and calculations for new fuel tank-4. Light pole anchorage details to follow at a later date.
SubNo.0181.1A_PE Design-Aboveground Vertical Tank Calculations
SubNo.0181.1B.R1_Tank Shop DrawingsSacramento County · 2025
E-Permit: Gas Line replacement, repair, or new leg, 30 L.F.City of Sacramento · 2016$400
E-Permit: Gas Line replacement, repair, or new leg, 10 L.F.City of Sacramento · 2016$250
Area served
City of Sacramento, Marin County, Sacramento County
Use this data — free
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you UNDERGROUND CONSTRUCTION CO INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to UNDERGROUND CONSTRUCTION CO INC's website. It links to this profile so homeowners can see the public permit record behind your work.