TWINPEAK SOLAR appears in public building-permit records with 5 permits filed through 2026 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is TWINPEAK SOLAR's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to TWINPEAK SOLAR by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is TWINPEAK SOLAR licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. TWINPEAK SOLAR has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is TWINPEAK SOLAR's work?
The most recent permit on record for TWINPEAK SOLAR is dated 2026-04-06, with 5 permits on file in total.
Installation of 11.285KW Solar System along with 13.5KWH of ESS; 238 233 inspections are required prior to setting panels.Sacramento County · 2026$32,163
Reviewed by SolarApp+ 25kw Solar PV System, 23 kw PV Storage System Size and nullgal Solar WH System (water heater installed null).City of Sacramento · 2025$72,828
REVISION TO RES-2505633 - updated the main breaker from 175A (new) to 200A (existing) and connected the 70A PV breaker in the MSP.City of Sacramento · 2025
16.2kw Solar PV System, and 0gal Solar WH System (water heater installed null) W/ESS & MAIN BREAKER C/O. All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION.
REVISION RES-2507225 - updated the main breaker from 175A (new) to 200A (existing) and connected the 70A PV breaker in the MSP.City of Sacramento · 2025$53,776
10.8kw Solar PV System, and 0gal Solar WH System (water heater installed null).
All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).”City of Sacramento · 2022