Cross street: AVENIDA DE ACACIAS
Description of Work: TI FOR UNION BANK TO INCLUDE: CREATING CONFERENCE ROOM, RECONFIGURE IT ROOM, NEW DUCTWORK, RELOCATE THERMOSTAT, CAP OFF WATER FOR WATER CLOSET, MISC EPM.
4/26/2021: PLAN CHANGE RECEIVED. REFERRAL SLIP NEEDED. KPSan Diego County · 2021
Finish InteriorCity of San Jose · 2020$5,000,000
Cross street: AVENIDA DE ACACIAS
Description of Work: TI FOR EXISTING "UNION BANK" TO INCLUDE RECONFIGURING FLOOR PLAN AND RESTROOMS.San Diego County · 2019
Cross street: LA GRANADA DR.
Description of Work: 330SF PATIO ENCLOSURE, MISC ELEC.San Diego County · 2016
Tenant ImprovementCity of San Jose · 2014$4,549,756
Cross street: El Camino Real Foundation: SLAB
Description of Work:3499 SF single story SFD, AC/FS, 825 SF Attached Garage, FIN/FS, 210 SF Entry Cover, 200 AMP, Temp Power
Notice to Permittee: Temp power shall be inspected prior to framing inspectionSan Diego County · 2013
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Cross street: El Camino Real Foundation: SLAB
Description of Work:Grading for 1001-20120460 (3499 SF single story SFD, AC/FS, 825 SF Attached Garage, FIN/FS, 210 SF Entry Cover, 200 AMP)San Diego County · 2013
CROSS STREET: AVNDA DE ACACIAS
DESCRIPTION OF WORK: T.I. OFFICE convert two offices into one office 1783 sq ft remove existing and replace interior partitions 130 lf to create offices and work spaces. Remove 1 restroom. Misc electrical, plumbing and mechanical.San Diego County · 2008
Cross street:AV DE ACACIAS
Description of Work:SINGLE STORY 600 SQ/FT ADDITION w/AC , MINOR INTERIOR REMODEL ( REPLACING/ADDING 143 L/F OF PARTITIONS and 78 SQ/FT OF WINDOWS & S DOORS) . ALL FOR EXISTING SFD.San Diego County · 2008
EPC - Size- 43,289 SF. Construction type- IIA. Occupancy- A3 & B. The following are components needed for the replacement. Architectural scope consisting of identification of existing rated walls. Structural scope consisting of identification of existing frame type, and rework of existing framing for new fire alarm control panel (FACP). Electrical scope consisting of demolition of existing FACP 120V circuit, and new 120V circuits for new FACP and fire alarm booster panels. Note: Fire alarm drawings are included for reference only.City of Sacramento · 2023$1,023,993
EPC - EXPEDITED - Improvement of existing office space. Addition of several small offices, a large conference room, medium conference room, and small conference room. New ductwork, electrical outlets, and sprinklers modifications. Majority of the space to remain open with furniture cubicles.City of Sacramento · 2021$750,000
Permitted projects on public record. Addresses are omitted for privacy.