What the public permit record shows, not self-reported reviews.
Is TRI - SIGNAL INTEGRATION INC a real contractor?
TRI - SIGNAL INTEGRATION INC appears in public building-permit records with 32 permits filed through 2022 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is TRI - SIGNAL INTEGRATION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to TRI - SIGNAL INTEGRATION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is TRI - SIGNAL INTEGRATION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. TRI - SIGNAL INTEGRATION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is TRI - SIGNAL INTEGRATION INC's work?
The most recent permit on record for TRI - SIGNAL INTEGRATION INC is dated 2022-07-19, with 32 permits on file in total.
EPC - FIRE ALARM: ADD NOTIFICATION APPLIANCES AND RELOCATED DEVICES DUE TO TENANT IMPROVEMENT (TI PERMIT WAS UNDER COM-2109416)City of Sacramento · 2022$104,338
EPC - Replace Existing Fire Alarm System with New. INSTALLATION OF A NEW FIRE ALARM SYSTEM. FURNISH: EQUIPMENT, CABLE DEVICES & NOTIFICATION APPPIANCES. FURNISH SHOP DRAWINGS AND PROGRAMING FOR THE FIRE ALARM SYSTEM.
revision COM-2313133 Including the addition of Sprinkler Bells.As-built changes to Fire alarm permit:City of Sacramento · 2022$255,410
EPC - TSI is to add a cellular dialer to the existing FACPCity of Sacramento · 2020$2,000
Suite 730 & 732 - Install Ansul Fire System.City of Sacramento · 2019$1,609
Install new Ansil systemCity of Sacramento · 2018$2,000
EPC - Deferred to COM-1709109 for Building 4 Fire AlarmCity of Sacramento · 2018
Connection of existing hood to electrical, to include fire system test for inspection.City of Sacramento · 2018
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you TRI - SIGNAL INTEGRATION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to TRI - SIGNAL INTEGRATION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$1,000
Revision to Com-1722381 revised ansul from previously approved.City of Sacramento · 2018
Install Ansul RIOZ Fire Supression System for Commercial Kitchen-Panda Express. (Built off of the original PR File with an address of 545 K St)City of Sacramento · 2018$1,000
EXPEDITED - Revision to Com-1722381 revised FS-01 and FS-02 sheets.City of Sacramento · 2018
EXPEDITED - REVISION to COM-1722385 to consist of : for Additional - added 1 new cheese griller, 1 new Install new ANSUL system for existing hood,, additional 3 gallon tank, multiple fire sprinklers added to kitchen stoves, Fryer size adjusted to correct size.City of Sacramento · 2017
Install new ANSUL system for existing hood.City of Sacramento · 2017$1,000
Permitted projects on public record. Addresses are omitted for privacy.