What the public permit record shows, not self-reported reviews.
Is TOWER CONSTRUCTION CO a real contractor?
TOWER CONSTRUCTION CO appears in public building-permit records with 13 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is TOWER CONSTRUCTION CO's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to TOWER CONSTRUCTION CO by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is TOWER CONSTRUCTION CO licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. TOWER CONSTRUCTION CO has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is TOWER CONSTRUCTION CO's work?
The most recent permit on record for TOWER CONSTRUCTION CO is dated 2025-11-10, with 13 permits on file in total.
Fire restoration of the existing fire damaged residence.Sacramento County · 2025$197,325
Re-roofing Shingles 4 sq. and Painting interior & exterior, removing dryrot in multiple areas inside and outside, minor electrical repairs light switches, changing existing fixtures. No occupants.Sacramento County · 2025$20,000
TENANT IMPROVEMENT FOR A NEW QUICK SERVICE MEXICAN RESTAURANT, TAQUERIA LA PERLA TAPATILLA.
WORK DESCRIPTION: INTERIOR COMMERCIAL ALTERATION IN THE (E) SERVICE AREA, THE FLOOR TILE AND THE FRONT COUNTER WILL BE REMOVED AND AT THE BOTH BATHROOMS AREA, THE FLOOR TILE, THE WALL TILE, THE TOILET, THE SINK AND THE URINAL WILL BE REMOVED, THE TOTAL AREA FOR DEMO IS 1093 SQ. FT. WILL BE UPGRADE THE ACCESSIBILITY REST ROOMS AREA, UPGRADE THE PAINT WASHABLE ON WALLS, CEILING AT THE PREPARATION AREA . INSTALLING NEW TILE FLOOR AND PAINT IN THE INTERIOR OF THE SUITE, AND UPDATING ALL THE ACCESSIBILITY WITH OCCUPANCY GROUP TYPE A-2 AND (E) CONSTRUCTION TYPE VA. THE PROPERTY HAVE READY ALL THE POINT CONNECTION FOR THE UTILITY SERVICES, EASEMENTS, HAVE AN EXISTING GREASE LINE AND (E) EXTERIOR GREASE INTERCEPTOR WORKING, ALSO IT IS AUTOMATIC FIRE SPRINKLED WITH A FIRE ALARM SYSTEM CURRENT, THERE, ARE NOT CHANGES ON THEIR USE.THE (N) QUICK SERVICE MEXICAN RESTAURANT HAVE A TOTAL CONSTRUCTION AREA OF 2123 SQSacramento County · 2021$8,360
EPC - EXPEDITED - 1) REMODEL EXISTING RETAIL M occupancy to Restaurant A-2 occupancy
2) REMOVE RESTRO0M
3) NEW TI WALLS
4) NEW EQUIPMENT
5) NEW MECHANICAL/PLUMBING/ELECTRICAL
6) NEW PATIO WITH NEW EXIT DOOR
7) RESTRIPE EXISTING ACCESSIBLE PARKINGCity of Sacramento · 2022$160,000
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you TOWER CONSTRUCTION CO?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to TOWER CONSTRUCTION CO's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
EPC - Suite A - Commercial Remodel to Include: Remove existing hood, install new hood. Update restroom fixtures as required. Updated restrooms and entry area for accessibility. Paint Walls. Washable ceilings and walls.City of Sacramento · 2021
$11,000
EPC - Install finish plumbing and electrical in commercial kitchen. Install appliances and add grease trap.City of Sacramento · 2021$13,000
EPC Submittal - Remodel of Commercial Building - 1. INSTALL BAR EQUIPMENT AND COUNTERS IN EXISTING HISTORICAL BUILDING TO USE THE AREA FOR ADDITIONAL DINING AREA FOR ADJACENT EXISTING RESTAURANT, MIDTOWN'S CANTINA ALLEY.
2. INSTALL WHEELCHAIR LIFT TO IMPROVE ACCESSIBILITY.
3. MODIFY 1ST FLOOR FOR ACCESSIBLE COMPLIANCE.
4. EXISTING HVAC TO REMAIN AS IS (THRU THE WALL HVAC)
****CYCLE 3: The lift is now going up to the second floor. Please retarget Life Safety and Preservation Cycle 3.*** - PLNG-INSPCity of Sacramento · 2019$55,000
PERMIT TO COMPLETE WORK ON COM-1722740: INTERIOR REMODEL TO EXISTING RESTAURANT TO INCLUDE REMOVE/CONSTRUCT NON BEARING WALLS, REMOVE 1 RESTROOM AND CREATE 2 NEW RESTROOMS, NEW DROP CEILING, NEW BAR AREA/SEATING, RELOCATE EXISTING SUB PANEL, REMOVE EXISTING DUCTWORK AND INSTALL NEW, LIGHTING/PLUMBING, FIRE SPRINKLER WORK AS NEEDED. SEE REVISION COM-1808138-Suspended Interior trellis over Bar Area w/ Details. See attached inspection history. valuation based on 15% of original expired permit.City of Sacramento · 2019$12,150
EXPEDITED - EPC Submittal - remodel to include new baking equipment, display cases, storage rooms, two new openings in wallCity of Sacramento · 2019$70,000
SUITE # 140 : Remodel to include: New Walk In Freezer; New Kitchen FIRE HOOD SYSTEM; All Cooking Appliances; RE STRIP existing accessible parking spaces; ACCESSIBLE RESTROOMS and UPGRADES, FRONT DOOR TO BE RELOCATED AND REPLACED; REMODEL OF THE ENTIRE INTERIOR TO CONSIST OF PLUMBING , MECHANICAL, INTERIOR DEMO.; STRUCTURAL AND ELECTRICAL.City of Sacramento · 2019$120,000
EXPEDITED - REVISION To COM-1722740-Suspended Interior trellis over Bar Area w/ DetailsCity of Sacramento · 2018
INTERIOR REMODEL TO EXISTING RESTAURANT TO INCLUDE REMOVE/CONSTRUCT NON BEARING WALLS, REMOVE 1 RESTROOM AND CREATE 2 NEW RESTROOMS, NEW DROP CEILING, NEW BAR AREA/SEATING, RELOCATE EXISTING SUB PANEL, REMOVE EXISTING DUCTWORK AND INSTALL NEW, LIGHTING/PLUMBING, FIRE SPRINKLER WORK AS NEEDED. SEE REVISION COM-1808138-Suspended Interior trellis over Bar Area w/ DetailsCity of Sacramento · 2017$81,000
Permitted projects on public record. Addresses are omitted for privacy.