CH-01 - The significant change to the original permit involves relocating the new UPS/Battery units to a new room and buildout of this room to house the system for a 2 hour rating. This involves upgrade of the existing fire suppression system and buildout of the walls of the room at the upgraded rating.Sacramento County · 2022
This work is to provide power and cooling redundancy for the Data Center.
Electrical will add new panels and 2 new UPS/battery systems and re-route existing power to create an A/B power system for the Data Center.
Mechanical work includes re-route of existing chilled water piping to create a redundant loop as well as demolition of existing duct that is no longer in use. Additionally there will be new louvers and Fire smoke dampers added between the Main Electric Room and the MER room to provide redundant cooling. New electrical fans will be installed for ventilation requirements for the new UPS additions.
Fire Protection work includes an upgrade of the Fire suppression system in the Battery room to provide dry type fire suppression., CH-01 - The significant change to the original permit involves relocating the new UPS/Battery units to a new room and buildout of this room to house the system for a 2 hour rating. This involves upgrade of the existing fire suppression system and buildout of the walls of the room at the upgraded rating.Sacramento County · 2022$5,174,049
T I - Install 2 Freezers And 2 Coolers - Target. Grocery Pick-Up ProgramMarin County · 2022$25,000
EPC - Revision to COM-1915154 for revised Civil drawings and details
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
EPC - Revised Landscape and Civil drawings and details to COM-1915154 and COM-2018754.City of Sacramento · 2023
EXPEDITED - EPC - Renovations to existing site security gate entrance on North B Street. Includes selective demolition of existing gate operators, gate arms, bollards and asphalt. Includes retrofit of existing fence and gates, installation of new sliding gate operators, gate arms, and card readers. Includes new concrete median, vehicle detection loops, and striping. Includes underground power and control conduit/wiring to equipment.City of Sacramento · 2023$300,000
EPC - Revision to COM-1915154 for revised Landscape and Civil drawings and detailsCity of Sacramento · 2023
EPC - Revision to COM-1915154 for revised Landscape and Civil drawings and detailsCity of Sacramento · 2023
EPC - Construction of a new 3,637SF canopy over an existing truck scale pit - PLNG-INSP
**SEE REVISION COM-2312817 Due to an existing utility conflict located along Gird B of the proposed truck scale canopy, the foundation and column locations have been shifted about 5' inside the the proposed canopy footprint. The overall canopy footprint has remained unchanged. A bollard alternative has also been included in lieu of column concrete encasementCity of Sacramento · 2023$585,000
Permitted projects on public record. Addresses are omitted for privacy.