There is a SMUD production meter attached to the customer's solar that needs to be re-attached to the building, (we recently completed siding). Smud is requesting a permit be pulled for them to allow access to the panel. There is no access to the box except by removing SMUD meter.Sacramento County · 2025
IN PROGRESS INSP REQUIRED; Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; REMOVE EXISTING COMP ROOFING AND INSTALL NEW COOL ROOF SHINGLE. REPLACE EXISTING GUTTERS WITH NEW. REPLACE DRY ROT AS NECESSARY.Sacramento County · 2025$30,000
IN PROGRESS INSP REQUIRED; REMOVE EXISTING COMP ROOF AND GUTTERS, INSPECT FOR DRY ROT, INSTALL NEW FLASHINGS AND NEW COOL ROOF.Sacramento County · 2023$25,000
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 50yr Laminated Dimensional Composition. CRRC: 0890-0015City of Sacramento · 2025$20,000
E-Permit: Tear Off - Yes, Resheet - Yes, 1 layer(s), 5 squares of 50yr Laminated Dimensional Composition. CRRC: 0890-0015City of Sacramento · 2025$5,000
E-Permit: Tear Off - Yes, Resheet - Yes, 1 layer(s), 24 squares of 50yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater.City of Sacramento · 2025
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.