Legalizing patio cover 363 SF See plans
GARAGE CONVERSION (241-SQFT)
- CONVERTING GARAGE TO TWO ROOMS. (ONE ROOM WILL BE THE AUDIO ROOM
AND THE OTHER WILL BE A LANUDRY ROOM).
- GARAGE DOOR WILL BE SEALED AND A NEW WINDOW WILL BE ADDED.
- THE LAUNDRY ROOM FLOOR WILL BE ELEVATED TO BE AT SAME HEIGHT AS THE
REST OF THE HOUSE
- AUDIO ROOM WILL HAVE CONCRETE POURED IN.
- NEW RECEPTACLES WILL BE ADDED FOR NEW AUDIO EQUIPMENT.
- NEW CAN LIGHTING WILL BE ADDED TO BOTH ROOMS.
- THE ROOM WILL NOT BE FOR SLEEPING, IT IS A WORKSPACE.Sacramento County · 2025$62,000
MASTER BATHROOM (72-SQFT)
- NO CHANGE OF LAYOUT
- REPLACING THE EXHAUST FAN
- REPLACING LIGHTING FIXTURES
- UPDATING SHOWER PAN AND PLUMBING FIXTURESSacramento County · 2025$32,000
Bathroom Remodel
- No change of layout
- Replacing the existing jetted tub to a standard tub
- The extra plumbing for the jetted tub will be properly sealed for no future use
- Existing plumbing for the shower fixture will remain
- Shower and plumbing fixtures will be replaced (like for like)
- None of the electrical will be moved
- The only alteration that will occur will be removing the existing outlet for the jetted tub, and replacing the outlets near the double sink vanity to be GFCISacramento County · 2025$20,000
Adding a portico to the front of the house above the main entrance door.Sacramento County · 2025$4,000
Kitchen Remodel
-Plumbing and electrical fixtures replaced, like for like
-Bringing electrical up to codeSacramento County · 2025
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Kitchen Remodel: Add (2) outlets; Run dedicated gas line from meter to cooktop; Add (9) can lights; Bringing electrical up to code
Hall Bathroom: Replace (E) tub with a (N) tub; Replace (E) exhaust fan; Bringing electrical up to code
Master Bathroom: Remove non-load bearing wall (wall doesn't go to the ceiling); Add free standing tub and add plumbing; Replace (E) exhaust fan; Plumbing and electrical fixtures replaced, like for likeSacramento County · 2025$80,500
DOWNSTAIRS (38-SQFT)
- REPLACING THE VANITY, SINK, PLUMBING FIXTURES. LIKE FOR LIKE.
- REPLACING EXHAUST FAN THAT WILL LEAD TO EXTERIOR.
- REPLACING THE WALL MOUNTED LIGHTING. LIKE FOR LIKE.
UPSTAIRS (39-SQFT)
- REPLACING THE VANITY, SINK, PLUMBING FIXTURES. LIKE FOR LIKE.
- REPLACING EXHAUST FAN THAT WILL LEAD TO EXTERIOR.
- REPLACING THE WALL MOUNTED LIGHTING. LIKE FOR LIKE.
MASTER BATHROOM (43-SQFT)
- REPLACING THE VANITY, SINK, PLUMBING FIXTURES. LIKE FOR LIKE.
- REPLACING EXHAUST FAN THAT WILL LEAD TO EXTERIOR.
- REPLACING THE WALL MOUNTED LIGHTING. LIKE FOR LIKE.
- REPLACE TUB/SHOWER WITH WALK-IN SHOWER.
-- NEW SHOWER PAN AND WATERPROOFING WALLS.
KITCHEN REMODEL (103-SQFT)
- REMOVING NON-LOAD BEARING WALL/PENINSULA AND ADDING A NEW ISLAND WITH
RECEPTACLE.
- MOVING EXISTING RECEPTACLES FROM NON-LOAD BEARING WALL TO ADJACENT
WALL. (ONE FOR DW AND OTHER FOR GARBAGE DISPOSAL UNDER SINK).
- MOVING APPLIANCES TO NEW LOCATIONS.
- REMOVING RAIL LIGHTING AND REPLACING THEM WITH CAN LIGHTING.
- REPLACING THE WASHER AND DRYER WITH A NEW STACKED WASHER/DRYER.
- MOVING SINK TO ADJACENT WALL.Sacramento County · 2024$80,000
Replacing electrical panel 125-Amp from to 200-Amp.
Main power coming from underground and it already has a 2" conduit.Sacramento County · 2024$1,300
STRUCTURAL: Removing walls between kitchen, living room, and family room.
KITCHEN: New 24-sqft island with two (2) new receptacles per code, adding electrical range on the island, adding three (3) pendant lights above the island,moving refrigerator.
LVING ROOM: adding an electrical fireplace with four (4) receptacles (one for fireplace and another for mounted TV)
MASTER MATHROOM: Replace lighting and plumbing fixtures and exhaust fan
HALL BATHROOM: Add exhaust fan
2ND BEDROOM: Add new ceiling fan
WINDOWS: Replace 11 windows and replace 1 sliding door
LIGHTING: Add 26 can lights through the whole house
GARAGE: Replace existing water heater with tankless water heaterSacramento County · 2023$258,500
CH-01: Install new sheetrock and finishes in master bedroom. Remove non-load bearing wall, install new exhaust fan, install new sheetrock and finishes in laundry room.Sacramento County · 2023
KITCHEN ***CONDO***
- NO CHANGE OF LAYOUT
- REPLACING EXISTING CAN LIGHTS WITH (N) 6" CAN LIGHTS
- REPLACING ALL APPLIANCES
- REPLACING SINK AND PLUMBING FIXTURESSacramento County · 2023$39,443
Addition:
- Build about 1130 sqft addition at the back of the house
- Remodeling the existing porch area to a bathroom
- Build a composite deck, CH-01: Install new sheetrock and finishes in master bedroom. Remove non-load bearing wall, install new exhaust fan, install new sheetrock and finishes in laundry room.Sacramento County · 2023$181,019
Permitted projects on public record. Addresses are omitted for privacy.