What the public permit record shows, not self-reported reviews.
Is SOLARLINK ENERGY CONSTRUCTION INC a real contractor?
SOLARLINK ENERGY CONSTRUCTION INC appears in public building-permit records with 16 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SOLARLINK ENERGY CONSTRUCTION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SOLARLINK ENERGY CONSTRUCTION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SOLARLINK ENERGY CONSTRUCTION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SOLARLINK ENERGY CONSTRUCTION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SOLARLINK ENERGY CONSTRUCTION INC's work?
The most recent permit on record for SOLARLINK ENERGY CONSTRUCTION INC is dated 2025-09-02, with 16 permits on file in total.
Installation of Rooftop PV Solar 4.8kw with 12 panels/microinvertersSacramento County · 2023$14,640
Installation of a 4.2kw rooftop solar systemSacramento County · 2023$15,120
Replacement of like for like 2 Ton Heat Pump for Unit 42B.Sacramento County · 2021$7,900
APARTMENT ATRIA SENIOR LIVING --REMOVE TUB, TOILET, SINK. INSTALL NEW SHOWER PAN WITH CURB. INSTALL NEW TOILET AND WALL HUNG SINK. REMOVE KITCHEN CABINETS, SINK, STOVE, AND REFRIGERATOR. INSTALL NEW CABINET AND COUNTER, SINK, FAUCET, REFRIGERATOR, AND MICROWAVE. RE-LABEL PANEL. PLACE BACKING FOR GRAB BARS AT SHOWER AND TOILET, INSTALL NEW CEILING FAN WITH FAN RATED BOX. INSTALL NEW HUMIDISTAT CONTROLLED BATH EXHAUST FAN TO EXISTING DUCTWORK. PATCH AND PAINT AS NEEDED, INSTALL NEW LIGHTING.Sacramento County · 2021$16,238
APARTMENT ATRIA SENIOR LIVING --REMOVE TUB, TOILET, SINK. INSTALL NEW SHOWER PAN WITH CURB. INSTALL NEW TOILET AND WALL HUNG SINK. REMOVE KITCHEN CABINETS, SINK, STOVE, AND REFRIGERATOR. INSTALL NEW CABINET AND COUNTER, SINK, FAUCET, REFRIGERATOR, AND MICROWAVE. RE-LABEL PANEL. PLACE BACKING FOR GRAB BARS AT SHOWER AND TOILET, INSTALL NEW CEILING FAN WITH FAN RATED BOX. INSTALL NEW HUMIDISTAT CONTROLLED BATH EXHAUST FAN TO EXISTING DUCTWORK. PATCH AND PAINT AS NEEDED, INSTALL NEW LIGHTING.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SOLARLINK ENERGY CONSTRUCTION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SOLARLINK ENERGY CONSTRUCTION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2021
$16,203
12.8kw Solar PV System, 15 kw PV Storage System Size and 0gal Solar WH System (water heater installed null).City of Sacramento · 2025$59,644
12kw Solar PV System, 6.5 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2025$48,720
5.5kw Solar PV System, 13.5 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2025$32,743
Installation of 4kw rooftop PV solar system. All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).City of Sacramento · 2023$12,000
Installation of 4kw rooftop solar system. “Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314City of Sacramento · 2023$12,000
7.6kw Solar PV System, and 0gal Solar WH System (water heater installed null).All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).City of Sacramento · 2023$22,800
Permitted projects on public record. Addresses are omitted for privacy.