WORK ASSOCIATED WITH THIS PERMIT WILL PRIMARILY BE CONDUCTED ON THE SECOND FLOOR. BUILDING RENOVATION (INTERIORS) WORK TO INCLUDE: NEW INFILL RATED WALL AT EXISTING ROLL DOWN GATE
NO WORK WILL BE CONDUCTED WITHIN THE EXISTING FIRST FLOOR TENANT SPACES.
THIS PROJECT WILL PROVIDE A RENOVATED SECOND FLOOR SUITE READY FOR TENANT. BUILDING INTERIORS DEMOLITION PORTIONS OF EXISTING FINISHES SHALL BE REMOVED AND REPLACED WITH NEW FINISHES.
BUILDING EXTERIOR DEMOLITION NO ALTERATION OF EXISTING BUILDING FACADE OR BUILDING FOOTPRINT WILL BE CONDUCTED AS PART OF THIS PERMIT.
BUILDING RENOVATION (EXTERIORS) NO WORK TO BUILDING EXTERIOR.
BUILDING UTILITIES NO WORK TO BUILDING UTILITIES.Sacramento County · 2025$3,000
Tenant improvement of an existing one-story commercial building. Tenant improvements include sales lobby, pharmacy, office, 2 single user restrooms, janitors closet and It/Storage room. REV01 Tenant improvement to existing single story commercial building. Tenant improvement includes sales lobby, pharmacy, office, 2 single user bathrooms, janitors closet and IT/storage rooms.Sacramento County · 2025$289,000
CH-01: REVISIONS TO INCLUDE NEW WALL ADDED FOR NEW OFFICE SPACE.
INFILL EXISTING ROLL UP DOOR, PER NOTE 12.Sacramento County · 2025
Interior remodel for landlord offices on site. New storage room. Remove and replace rooftop HVAC units.
HOWBOUT ARDEN, nullSacramento County · 2025$395,000
CH01 - plumbing revisions for remodel.Sacramento County · 2024
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Interior remodel Arden Watt Marketplace. Tenant interior fit out with new finishes throughout. Minor exterior modifications include new egress doors and new storefront with new entry/exit doors., CH01 - plumbing revisions for remodel.Sacramento County · 2024
$1,350,000
· COMMERCIAL TENANT IMPROVEMENT TO INCLUDE NEW CEILING GRID
TO THE EXISTING CLASSROOM
· NEW LIGHTING, ELECTRICAL AND MECHANICAL SERVICES
· NO CHANGE IN OCCUPANCY TYPE
· NO CHANGE IN BUILDING FOOTPRINTSacramento County · 2024$70,500
CH-02 Mechanical, Electrical and Plumbing changes. Due to as-built conditions, the rooftop unit locations have been revised and ductwork reconfigured accordingly. Main distribution diagram revised per as-built conditions with existing 480V rooftop units. Gas distribution diagram has been revised to match updated plumbing plans. See summary list of complete list of changes.Sacramento County · 2023
Converted from CBAC2022-00761, fees transferred.
Tenant improvement of new shell space for construction of new restaurant with outdoor patio and exterior remodel, CH-01 We are submitting the revised sheets that were inadvertently not included in the last submittal prior to permit
issuance. Per direction from Mr. Frazee, we are including only the revised sheets with this submittal. The reason for
change is for all sheets to be coordinated with the restroom modification (revised men’s restroom to be multi
user) required from the cycle 1 plan check comment prior to permit issuance. No additional items were changed in this submittal.- See attached summary., CH-02 Mechanical, Electrical and Plumbing changes. Due to as-built conditions, the rooftop unit locations have been revised and ductwork reconfigured accordingly. Main distribution diagram revised per as-built conditions with existing 480V rooftop units. Gas distribution diagram has been revised to match updated plumbing plans. See summary list of complete list of changes.Sacramento County · 2023$280,000
CH-01 We are submitting the revised sheets that were inadvertently not included in the last submittal prior to permit
issuance. Per direction from Mr. Frazee, we are including only the revised sheets with this submittal. The reason for
change is for all sheets to be coordinated with the restroom modification (revised men’s restroom to be multi
user) required from the cycle 1 plan check comment prior to permit issuance. No additional items were changed in this submittal.- See attached summary.Sacramento County · 2023
CH-02
Deferred submittal for awningSacramento County · 2023
Expedite - LANDLORD WORK- NEW STOREFRONT, NEWPARAPET, NEW AWNING, NEW ENTRY FRONT, NEW INTERIOR PERIMETER WALLS, NEW EXHAUST FAN, NEW PANEL, MINOR PLUBMING WORK. - No Occupancy., null, null, nullSacramento County · 2023$600,000
Permitted projects on public record. Addresses are omitted for privacy.