residential (1) Tesla ESS installSacramento County · 2026$25,692
Solar PV Roof Mount 29.32 KW, CH-01 - Update main breaker to a 100A, update wire from main to both disconnects to #4, update solar load center panel to show the 15A 3-pole that run IQ gateway, 15A single pole for the comms kit 2. 40A breaker is for EV charger. total breakers in panel should include 5 3-pole 20A breakerSacramento County · 2024$78,460
Residential roof mounted PV system 10 modules 4kWMarin County · 2024$13,500
RESIDENTIAL / GENERALCity of West Sacramento · 2023$32,384
1 Tesla Backup Battery with 1 Tesla Backup Gateway IncludedMarin County · 2023$10,000
Installation of a rooftop 7.20 kW (DC) photovoltaic system, sub panel installation, derate main breaker, 18 modules, 1 inverterSacramento County · 2022$28,950
7.82kw Rooftop Photovoltaic - ExpressMarin County · 2021
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$27,409
Like for like 100A main panel upgrade.Marin County · 2021$2,000
4.76kw Rooftop PhotovoltaicMarin County · 2021$19,459
6.460 Kw Rooftop PhotovoltaicMarin County · 2021$22,538
CROSS STREET: Web
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT)
*The scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels.
This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2020
Cross Street: BUENA CREEK RD
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.San Diego County · 2019
Permitted projects on public record. Addresses are omitted for privacy.