THE SCOPE OF THIS PROJECT IS LIMITED TO MISCELLANEOUS ELECTRICAL WORK WITHIN AN EXISTING BUILDING AS
DETAILED IN THE ELECTRICAL DRAWINGS.
NO NEW WORK OR ALTERATIONS PROPOSED FOR EXISTING STRUCTURAL, MECHANICAL, PLUMBING, FIRE SPRINKLER
AND FIRE ALARM SYSTEM UNDER THIS PERMIT.
IN GENERAL, THE TENANT'S LAYOUT OF EXISTING WALLS IS TO REMAIN AS-IS. NO CHANGE IN USE OR OCCUPANCY.
CA. Dept. of Public HealthSacramento County · 2026$35,848
Provide Labor and Material to demo existing lighting and lighting circuitry. Provide and install (103) new LED high-bay fixtures with individual motion controls at each fixture to work in a quadrant mode, separating the warehouse into (4) zones activated by any of the motion sensors in each zone. Provide override control switches for each zone. Provide and install (10) new LED bug eye fixtures. Provide and install (2) new LED surface mount fixtures with battery back for the (2) door son the east side of the building. Provide and install (1) egress fixture to replace the broken fixture above the office door.Sacramento County · 2025$134,668
Demo existing (1) 800A 480V panel, (1) 225 KVA Transformer and (1) 800A 208V Panel. Intercept 800A Feeder between B&C bay. Install (1) new 400A 480V panel, (1) new 400A 208V panel with (2) new 400A feeders. Cut over the (2) 1600A services to new 800A & 400A panels. Install (1) new 200A 208V feeder from new 1600A switchboard to existing 200A 208V panel for office. Install (1) new 200A 480V feeder from new 1600A switchboard in the main warehouse to existing 200A 480V panel for office. Demo (2) existing 1600A 480V main switch bards, (2) existing 500 KVA transformers, (2) existing 1600A 208V distribution switchboards and relocating to warehouse space. Extend (2) existing 1600A feeders to new locations in main warehouse. Re-install (2) existing 1600A 480V panels, (2) transformers & (2) 208V distribution panels in warehouse space.Sacramento County · 2025$611,122
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
(BUILDING COMPLIANCE) - Install Transformer and associated electronics in existing building
1. Install new 112.5KVA 480v to 400v Transformer.
2. Install new 200a, 480v, 3 Pole Breaker in existing panel A
3. Install new 200a, 480v, 3 phase cooper feeders from existing panel A to new transformer
4. Install new 200a, 600v disconnect with 150a fuses
5. Install new 150a, 400v, 3 phase cooper feeders from the secondary side of the transformer to new disconnect
6. Install new 150a, 400v, 3 phase cooper feeders form new disconnect to new control panel.
7. Install new 30a, 3 pole breaker in existing panel B
8. Install (2) new 15a, 3 pole breaker in existing panel B
9. Install new 30A, 3phase cooper feeders from existing panel B to new chiller location
10. Install new 15a, 3phase cooper feeders from existing panel B to new equipment A location
11. Install new 15a, 3phase cooper feeders from existing panel B to new equipment B location
12. Install new 15a, 3phase disconnect at new chiller Location
13. Install new 15a, 3phase disconnect at new equipment A location
14. Install new 15a, 3phase disconnect at new equipment B locationSacramento County · 2025
$61,231
1.PROVIDE LABOR TO DEMO THE EXISTING FEEDERS FROM THE EXISTING CONDUIT.
2. PROVIDE AND INSTALL (1) NEW 800A 208V FEEDER TO REPLACE THE EXISTING.
3. TERMINATE, LABEL AND TEST.Sacramento County · 2025$16,100
The scope of this project is an electrical modification at an existing site. These electrical drawings indicate the general scope of the project in terms of electrical design concept, major electrical elements, and the type of electrical systems. As scope documents, these drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements.
1. Provide and install new 200A sub panel and feeders fed from existing distribution panel PP.
2. Provide and install (3) dual port EV chargers w/dedicated 40A-208V/1ø circuits per charger.
3. Provide and install (9) single head pole lights.Sacramento County · 2025$116,995
1. Provide labor to demo to all existing light fixtures.
2. Provide demo of all existing EM signs and lights.
3. Provide labor to haul off and recycle the exiting ballast and lamps.
4. Provide and install new 2x4 LED fixtures throughout the office and stairway, including new mc cable with 0-10V wire for title 24.
5. Provide and install new surface wrap LED fixtures throughout the bathrooms, janitor closets and standard closets, including new cable with 0-10V wire for title 24.
6. Provide title 24 compliant lighting control.
7. Provide and install new exit signs and EM egress lighting.
8. Provide and install exterior landing EM egress lighting.
9. Provide and install mechanical power to (1) MAU.
10. Provide and install mechanical power to (2) SEF.
11. Provide new breakers for the new circuits.
12. Provide design permit drawings.
13. Terminate, Test and label.
Capitol Helicopter LightingSacramento County · 2025$391,496
Install 100A 480V overhead service. Install (2) new disconnects off of the new service to provide power to (1) office trailer and (1) boiler.Sacramento County · 2025$23,950
1. INTERCEPT EXISTING FEED BETWEEN EXISTING PANEL 'A' AND EXISTING PANEL 'B'.
2. INSTALL NEW ATS SWITCH INSIDE OF EQUIPMENT BAY.
3. INSTALL NEW CONDUIT AND FEEDERS FROM EXISTING PANEL 'A' TO NEW ATS SWITCH.
4. DEMO EXISTING EXTERIOR WALKWAY.
5. TRENCH FROM EDGE OF BUILDING TO NEW GENERATOR PAD LOCATION.
6. INSTALL CONDUITS AND FEEDERS FROM NEW ATS LOCATION TO NEW GENERATOR PAD LOCATION VIA TRENCH.
7. INSTALL NEW CONDUIT AND FEEDERS FROM EXISTING PANEL 'B' TO NEW GENERATOR PAD LOCATION VIA TRENCH.
8. POUR NEW GENARATOR PAD AND WALKWAY.
9. INSTALL NEW 20KW 120/208V 3? GENERATOR.
10. INSTALL NEW CONDUIT AND FEEDERS FROM NEW ATS TO EXISTING PANEL 'B'.
11. INSTALL NEW CONCRETE FILLED STEEL PROTECTIVE BOLLARDS.
12. CONNECT FEEDERS FROM NEW ATS AND EXISTING PANEL 'B' TO NEW GENERATOR.Sacramento County · 2024$76,887
Electrical only to install (2) customer provided power poles and run 4 circuits to them per plans. /*Sacramento Mather Airport Suite DSacramento County · 2024$4,585
Replace one damaged 200A breaker with exact working replacement.
(Lions Gate Hotel)Sacramento County · 2023$2,500
Installing (14) 25' solar light polesSacramento County · 2023$198,746
Permitted projects on public record. Addresses are omitted for privacy.