What the public permit record shows, not self-reported reviews.
Is SACRAMENTO ELECTRIC a real contractor?
SACRAMENTO ELECTRIC appears in public building-permit records with 26 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SACRAMENTO ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SACRAMENTO ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SACRAMENTO ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SACRAMENTO ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SACRAMENTO ELECTRIC's work?
The most recent permit on record for SACRAMENTO ELECTRIC is dated 2025-11-06, with 26 permits on file in total.
Install 40A circuit for TESLA EV ChargerSacramento County · 2024$1,500
install dedicated 20A EV charger circuit in the garageSacramento County · 2023$1,600
add 40A 240 circuit for EV chargerSacramento County · 2022$400
Install new 100A sub panel, install new 50A 240V EV circuit, relocate some of the existing loads from main panel into sub panelCity of Sacramento · 2025$4,800
E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, Replacement weather head/masthead work, main breaker replacement, adding 1 outlets (240V).City of Sacramento · 2025$4,300
Install (1) 40a 240v outlet for EV charger in garage. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2025$800
Install new 40A 240V circuit for Level II EV charger. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SACRAMENTO ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SACRAMENTO ELECTRIC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Sacramento · 2024
$2,100
E-Permit: existing panel 100 Amps - Overhead service, new main panel 100 Amps, Replacement weather head/masthead work, main breaker replacement.City of Sacramento · 2024$5,700
INSTALL NEW 2P 40A BREAKER INTO EXISTING 100A SUB-PANEL. RUN 2#8 & 1#10 THHN APOX 10'. INSTALL NEW L14-50 FOR EV CHARGER. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2024$760
Electrical- Install NEMA 14-50 plug for future EV All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).”City of Sacramento · 2024$870
Electrical Permit: Add 4 general purpose GFCI on the exterior of the home using existing electrical panel and adding 1-20A 120V circuit. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.City of Sacramento · 2024$3,500
Utilizing existing electrical panel to add new 40A breaker and install NEMA 14-50 Plug for EV charger. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2023$750
Permitted projects on public record. Addresses are omitted for privacy.