What the public permit record shows, not self-reported reviews.
Is RAMPART ENTERPRISES INC a real contractor?
RAMPART ENTERPRISES INC appears in public building-permit records with 39 permits filed through 2026 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is RAMPART ENTERPRISES INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to RAMPART ENTERPRISES INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is RAMPART ENTERPRISES INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. RAMPART ENTERPRISES INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is RAMPART ENTERPRISES INC's work?
The most recent permit on record for RAMPART ENTERPRISES INC is dated 2026-03-24, with 39 permits on file in total.
Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Remove and replace (1) 125A house panel. Like for like.Sacramento County · 2026$2,500
Install a new GENERATOR Model VD550-04FT4 / 550 kWe / 480/277V 3 Phase 60 HZ. Generator is being installed in a location that previously housed a generator years before. Currently this location has an iron fence enclosing it.Sacramento County · 2026$300,000
This is Fire Damage Repair Work. EXPEDITED REVIEW requested. Scope of Work: Remove and replace One (1) 100amp panel and feeder from existing MSB. Intercept existing circuitry and provide and install new circuitry where fire damage occurred. REV02 Electrical contractor is no longer installing an additional panel, but deleting it entirely. This revision scope will involve removing existing Panel C1 due to fire damage. Redirecting all circuitry to Panel B1. Providing temporary power during duration of wall repair due to fire damage.Sacramento County · 2025$36,000
Remove existing bussing couplers between the main breaker section and the distribution section. Install gutter on top of the existing switchboard to house the new cables from the load side of the 2500 amp breaker to the fully rated bussing of the 1600 amp section. Tap the bussing of the 1600 amp section with the new 2500 amp cables. Service will receive a new UL listing. /*143 Logistics Center Electrical RoomSacramento County · 2025$15,000
* Remove (E) service disconnect and replace with code compliant service disconnect.
* Remove and replace (E) Zinsco panels due to insurance requirements.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you RAMPART ENTERPRISES INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to RAMPART ENTERPRISES INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2025
$27,500
New distribution sections are being added to the (3) switchboards (switchboards installed under separate permit # CBAC2023-00219). Locations of the new distribution sections have been added to the building plan.Sacramento County · 2025$183,000
Remove existing vandalized 600A 120/208V 3PH MSB and replace with new 600A 120/208V 3PH MSB. Install (4) 500 AL conductors in each of the (2) existing 4" conduits. Intercept existing UFER and connect to new MSB. Intercept existing feeders to existing panels and connect to new MSB. Provide (2) additional ground rods. /*JACK IN THE BOXSacramento County · 2024$47,000
ONE FOR ONE 100AMP PANEL REPLACEMENTSacramento County · 2023$1,500
Provide new underground circuitry to new monument sign. Provide and install new weatherproof disconnect switch.Sacramento County · 2023$8,300
ELECTRICAL SERVICE UPGRADESacramento County · 2023$7,000
Replace existing vandalized meter/main and panel. Coordinate with SMUD to replace overhead secondary service. Connect existing flood lights to new panel.Sacramento County · 2022$5,000
- This California Family Fitness location had smoke coming from the secondary conduits.
- SMUD is in the process of disconnecting the conductors from the transformer.
- We will then pull out the conductors that were smoking, inspect and repair any damages.
- Lastly, we will pull in new secondary conductors.
At this time we will need an inspection to get SMUD to come back and connect to the new conductors to the transformer and energize the transformer.Sacramento County · 2022$25,000
Permitted projects on public record. Addresses are omitted for privacy.