What the public permit record shows, not self-reported reviews.
Is PRO AIR a real contractor?
PRO AIR appears in public building-permit records with 27 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is PRO AIR's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to PRO AIR by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is PRO AIR licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. PRO AIR has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is PRO AIR's work?
The most recent permit on record for PRO AIR is dated 2025-11-04, with 27 permits on file in total.
TO INSTALL ONE NEW BOSCH 18 SEER 3 TON VARIABLE CAPACITY PACKAGE HEAT PUMP CONVERSION, TO INCLUDE REMOVAL AND DISPOSAL OF OLD EQUIPMENT, THE COMPLETE INSTALLATION OF ONE BOSCH 3 TON 18 SEER HEAT PUMP UNIT, NEW ECOBEE WI-FI THERMOSTAT, NEW ELECTRICAL CIRCUIT AND DISCONNECT AS NEEDED, COMPLETE REPLACEMENT OF DUCTS AS NEEDED TO STATE STANDARDS, ALL DUCT CERTIFICATIONS AND PERMITS INCLUDED, WITH ALL NECESSARY GAS, ELECTRICAL, SHEET METAL, AND PLUMBING CONNECTIONS. WITH COMPLETE SYSTEM START-UP.
EQUIPMENT LIST
1 BPBA-36RCB-M185 BOSCH 18 SEER VARIABLE CAPACITY 3 TON PACKAGE HEAT PUMP
1 ECO-BEE WI-FI THERMOSTAT
*WARRANTY: TWO YEARS LABOR, TEN YEARS PARTS, TEN YEARS ON COMPRESSOR
REBATE OF $2,500.00 FROM SMUD REBATE AND $1,500.00 FROM TECH CLEAN MAKING NET COST $16,265.00 AND A TAX CREDIT UP TO $2,000.00 AVAILABLE SEE YOUR ACCOUNTANT.Sacramento County · 2025$20,265
TO INSTALL ONE NEW LENNOX 17 SEER 4 TON MODULATING HEAT PUMP. TO INCLUDE REMOVAL AND DISPOSAL OF OLD EQUIPMENT. THE COMPLETE INSTALLATION OF ONE NEW LENNOX CONSTANT TORQUE HIGH EFFICIENCY AIR HANDLER, NEW LENNOX 4 TON 17 SEER MODULATING HEAT PUMP CONDENSER, NEW 4 KW HEAT STRIP, NEW ICOMFORT WIFI S30 THERMOSTAT, COMPLETE SEALING OF DUCTS TO STATE STANDARDS. WITH ALL NECESSARY ELECTRICAL, PLUMBING, SHEET METAL, AND DUCT WORK CONNECTIONS. PERMITS, DUCT CERTS AND COMPLETE START UP INCLUDED.
EQUIPMENT LIST
1 EL18XPV-048 LENNOX 4 TON 17 SEER MODULATING HEAT PUMP
1 CBA27UHV-048 LENNOX HIGH EFFICIENCY VARIABLE SPEED FAN COIL
1 4 KW HEAT STRIP
1 ICOMFORT M30 WIFI THERMOSTAT
WARRANTY: TWO YEARS LABOR, TEN YEARS PARTS, AND TEN YEARS ON COMPRESSOR.
ONE YEAR SERVICE AGREEMENT INCLUDED AT NO CHARGE.
*INSTANT REBATE OF $3500 FROM SMUD & $1000.00 FROM TECH CLEAN NOT INCLUDED WE DO THE PAPERWORKSacramento County · 2023$19,000
TO INSTALL ONE NEW LENNOX 4 TON 16 SEER TWO STAGE HEAT PUMP SYSTEM TO INCLUDE, REMOVAL AND DISPOSAL OF OLD EQUIPMENT, COMPLETE INSTALLATION OF ONE NEW LENNOX VARIABLE SPEED CONSTANT TORQUE FAN COIL, NEW 4 TON 16 SEER TWO STAGE HEAT PUMP CONDENSER, WI-FI THERMOSTAT, NEW 5 KW HEAT STRIP, REPLACE REGISTER AS NEEDED FOR PROPER AIR FLOW, INSTALL NEW SUPPLY AND RETURN AIR PLENUM AS NEEDED, NEW FREON LINE SET INSTALLED IN WALL ONCE SIDING IS REMOVED, INSTALL NEW MERV 11 AIR FILTER, WITH ALL NECESSARY ELECTRICAL, PLUMBING, DUCT WORK AND SHEET METAL CONNECTION. INCLUDES PERMITS AND DUCT CERTS.
EQUIPMENT LIST
LENNOX 16HPX-048-230 4 TON 16 SEER TWO STAGE HEAT PUMP
LENNOX CBA27UHE-048 VARIABLE SPEED FAN COIL W/5KW HEAT STRIP
I WI-FI THERMOSTAT
MERV 11 AIR FILTER
*TWO YEAR MAINTENANCE AT NO CHARGE INCLUDED.
*WARRANTY 10 ALL PARTS 10 YEARS ON COMPRESSOR AND 2 YEARS LABOR.
*TO UPGRADE TO 10 PARTS AND LABOR EXTENDED WARRANTY ADD $1700.00 INITIAL HERE_______
*TO UPGRADE TO THE MERV 16 AIR FILTER ADD $150.00 INITIAL HERE TO APPROVE____________
*TO UPGRADE TO THE PURE AIR PURIFIER ADD $1200.00 INITIAL HERE TO APPROVE__________
SMUD REBATE OF $3000.00 AVAILABLE BUT NOT INCLUDED, WE DO THE PAPERWORK
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you PRO AIR?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2021
$23,573
TO INSTALL ONE NEW LENNOX BETTER 20 SEER 4 TON MODULATING HEATING AND AIR CONDITIONING SYSTEM. TO INCLUDE REMOVAL AND DISPOSAL OF OLD EQUIPMENT. THE COMPLETE INSTALLATION OF ONE NEW LENNOX 99% VARIABLE SPEED MODULATING FURNACE, NEW HEALTHY CLIMATE MERV 11 AIR FILTER, NEW HIGH EFFICIENCY EVAPORATOR COIL, NEW LENNOX 4 TON 20 SEER MODULATING AIR CONDITIONING CONDENSER, NEW ICOMFORT WI-FI THERMOSTAT, RETURN AIR PLENUM MODIFICATIONS AS NEEDED, NEW IHARMONY ZONAL CONTROL WITH NECESSARY DUCT MODIFICATION INCLUDING ZONE DAMPERS, REPLACE DAMAGED DUCTS IN ATTIC AND TRY TO LOCATE BROKEN DUCT SOMEWHER IN ATTIC MAY REQUIRE REMOVAL OF SHEET ROCK AT ADDITIONAL COST TO REPAIR, COMPLETE SEALING OF DUCTS TO STATE STANDARDS. WITH ALL NECESSARY ELECTRICAL, PLUMBING, SHEET METAL, AND DUCT WORK CONNECTIONS. PERMITS, DUCT CERTS AND COMPLETE START UP INCLUDED.
EQUIPMENT LIST
1 XC20-048 LENNOX 4 TON 20 SEER MODULATING AIR CONDITIONER
1 SLP99UH090XV48B LENNOX 99% VARIABLE MODULATING FURNACE
1 LH42/62X9 OR EQUIVALENT EVAPORATOR COIL
1 MERV 11 HEALTHY CLIMATE AIR FILTER
1 ICOMFORT S30 WI-FI THERMOSTAT
1 IHARMONY ZONE THERMOSTAT
1 IHARMONY ZONAL CONTROLLER
WARRANTY: TWO YEARS LABOR, TEN YEARS PARTS, AND TEN YEARS ON COMPRESSOR LIFE ON FURNACE HEAT EXCHANGERSacramento County · 2021$21,500
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2024$8,790
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2024$27,782
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2024$19,893
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2024$16,100
Change-out Roof Mount to Roof Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2024$18,000
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2023$19,908
Change-out w/new ducts Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2022$23,996
HVAC CHANGE OUT AND HEAT PUMP WATER HEATER INSTALLATION. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).City of Sacramento · 2022$41,143
Permitted projects on public record. Addresses are omitted for privacy.