***FAST TRACK*** MAIN CASE = CBNC2022-00077 Renovation of the facade and interior of the existing Community building for an affordable housing project on a 4.11 acre site. The existing child care is not part of the renovation scope and will remain a separate occupancy., CH-01 Bldg. C - Existing Community Building/Leasing Office/Child Care Center
Adding metal awnings to the building above the new entrances., CH-02 Roof trusses and calculations for Bldg. C., CH-03 Addition of 4 new roof mounted mechanical units require new structural support not addressed on the approved plans. The new work consist of new steel mechanical unit support channels secured to the existing steel roof trusses & addition of built-up roof insulation to create a new roof slope under the previously approved TPO roof finish material., CH-04 - Modifications to an existing non-conforming occupancy separation wall. The existing occupancy separation wall does not meet the requirements of the 2019 CBC, the code which this project was permitted under. This application proposes a detail which maintains the continuity of the required 1-HR construction for separation walls at the location indicated on the submitted plans., CH05 - Deferred Submittal - Bldg. C Storefront Doors (Includes windows provided by same sub)., CH06 - Providing Building C facade details, these details were not provided as part of the original permit (CBAC2022-00159) or the new roof permit (CBAC2022-00159-03) approval. Details have been developed and are in response to demolition and existing conditions not know at time of original permit., CH-07 - The application is for a modification to an existing permit CBAC0222-00159. We are making modifications to the approved exiting path as indicated in the attached plans. REV03 The 2022 permitted set of construction documents indicated that 4 existing rooftop HVAC units were to be replaced and 8 units were to be reused. While stored onsite during the rehab, the 8 existing HVAC units were vandalized and are no longer in working condition. As a result, we are now submitting plan revisions under the existing Building C permit (CBAC2022-00159) that include replacing 4 of the 8 damaged HVAC units. Revised mechanical, electrical, and Title 24 plans are being submitted for your review.Sacramento County · 2025$1,570,316
**FAST TRACK** Proposed 3-story tuck under residential building for an affordable housing project on a 4.11 acre site. The housing project also includes exterior renovation of an existing 2-story residential building and the renovation of a 1-story community building., CH01 - Prefab Roof Trusses for Bldg. B Exterior Improvements., CH-02 Details (Stairs, Guardrails, Handrails, Cane Rail) - Bldg. A, CH-03 Truss layout and calculations for Bldg. A., CH04 - Solar panels have been removed from approved plans; owner is participating in Smud Solar Shar Program. Title-24 Energy Compliance Sheets have been updated to reflect the removal of the solar components and compliance. with requirements of Title-24 energy requirements. The architectural roof plan has been revised and submitted herewith to reflect the removal of the solar panels and components., CH05 - Modification to D02 Truss, CH06 - Elevator Plans & Metal Shop Drawings - Adding elevator to new construction building., CH07 - A 500-gallon propane tank and masonry enclosure to be installed for water heating for building A only., CH01 - Deferred Submittal for storefront doors (2) at Bldg. A., CH-09 - Construct Proto-II Wall, CH-10, CH-11 - Deferred Fabricate and install metal awnings over the main entrances (2)., CH-12 Deferred submittal Two-way emergency system., CH-13 - 20X20 Shade Structure
Are you PRECISION GENERAL COMMERCIAL CONTRACTORS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
MAIN CASE = CBNC2022-00077 - 4390 47TH AVE.
***FAST TRACK***Renovation of the facade of an existing 2-story residential building as part of an affordable housing project on a 4.11 acre site. Also includes swapping of the cabinetry and appliance in the exiting units, as well as updating units to meet mobility standards. The housing project also includes a new 3-story tuck under residential building and the renovation of a 1-story community building., CH-01 Bldg. B - Shop Drawings - Stair Assembly, Handrail, Guardrail, Cane Rail, CH-02 - Deferred submittal of playground equipment and fall protection., CH03 - Replacement of damage areas in Child Care portion of building due to reconstruction / demolition of renovated areas under original permit.Sacramento County · 2025$7,955,845
CH07 - A 500-gallon propane tank and masonry enclosure to be installed for water heating for building A only.Sacramento County · 2025
CH-13 - 20X20 Shade StructureSacramento County · 2025
CH-12 Deferred submittal Two-way emergency system.Sacramento County · 2025
CH10 - Bldg. A is new construction. A roof hatch and ladder is called out for installation. 'Steel Ladder' is called out as a deferred submittal.Sacramento County · 2025
CH08 - Deferred Submittal for storefront doors (2) at Bldg. A.Sacramento County · 2025
CH06 - Elevator Plans & Metal Shop Drawings - Adding elevator to new construction building.Sacramento County · 2025
CH06 - Providing Building C facade details, these details were not provided as part of the original permit (CBAC2022-00159) or the new roof permit (CBAC2022-00159-03) approval. Details have been developed and are in response to demolition and existing conditions not know at time of original permit.Sacramento County · 2024
CH05 - Deferred Submittal - Bldg. C Storefront Doors (Includes windows provided by same sub).Sacramento County · 2024
CH-02 Roof trusses and calculations for Bldg. C.Sacramento County · 2024