What the public permit record shows, not self-reported reviews.
Is PLATINUM ELECTRIC a real contractor?
PLATINUM ELECTRIC appears in public building-permit records with 24 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is PLATINUM ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to PLATINUM ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is PLATINUM ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. PLATINUM ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is PLATINUM ELECTRIC's work?
The most recent permit on record for PLATINUM ELECTRIC is dated 2025-10-10, with 24 permits on file in total.
(MAIN CASE TO MISC2024-00267 TO MISC2024-00268)
Replace existing sub-panel changeout, like for like. There are 10 units and one laundry room. /*UNITS: 1, 2, 3, 4Sacramento County · 2025$4,000
The riser conduit was pulled off the wall and needed to be reattached.Sacramento County · 2024$350
Upgrading 100A surface mounted meter panel to a 200A surface mounted meter panel.Sacramento County · 2023$2,000
Panel upgrade, convert overhead flush mount 200a panel to a 400a surface mount panel.Sacramento County · 2023$4,000
Panel changeout like for like 125amp flush mount.Sacramento County · 2023$2,000
Upgrading existing 100amp panel.Sacramento County · 2022$1,500
AP-16 REQUESTED: Change out existing Zensco 200amp panel.Sacramento County · 2021$1,800
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you PLATINUM ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to PLATINUM ELECTRIC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
EPC - (1) EXISTING METER BANK, 100A, 120/240V, 1Ø. WITH (8) RESIDENTIAL SMUD METERS AND
(1) HOUSE METER,
(1) EXISTING HOUSE PANEL, 50A, 120/240V,1Ø.
3 (8) EXISTING LOAD CENTERS, 50A, 120/240V,1Ø.
MAGED R AOUFKAMEL
LICENSED PROFESSIONAL ENGINEER
STATE OF CALIFORNIA
ELECTRICAL
PROVIDE AND INSTALL:
3
1
NEW BUS GUTTER, 300A,120/240V, 1Ø, #2 CU GEC, 5/8" DIA x 8' GROUNDING ELECTRODE.
5 NEW 50 AMP FEEDER, (3) #4 CU THHN, #10 AWG GND.
6 NEW LOAD CENTER, 50A, 120/240V,1Ø.
7
4 NEW METER STACK WITH 300A,120/240V, 1Ø, (8) SMUD RESIDENTIAL METERS WITH
INTEGRAL SURGE PROTECTION, (1) HOUSE METER, METER STACK, BUS GUTTER,
DISTRIBUTION PANEL AND ASSOCIATE CONDUIT AND WIRING SHALL BE LOCATED IN
ELECTRICAL CLOSET.
2 NEW 300A FUSED DISCONNECT, 120/240V, 1Ø.
NEW 300 AMP, 120/240V, 1Ø SERVICE RISER ON WEATHER HEAD, 3" RMC WITH
(3) 300 KCMIL AL, AND #4 AWG CU GND.
8 NEW HOUSE PANEL, 50A, 120/240V,1Ø, WITH TEST BYPASS.
(E) LOAD CENTER IN RESIDENCE, 50A, 120/240V,1Ø.City of Sacramento · 2025$10,000
EPC - Replace meter equipment like for like on the exterior of building.City of Sacramento · 2025$10,000
EPC - Electrical panel upgradesCity of Sacramento · 2025$10,000
EPC - Electrical panel upgrades.City of Sacramento · 2025$8,000
EPC - Electrical panel upgradesCity of Sacramento · 2025$12,000
Permitted projects on public record. Addresses are omitted for privacy.