CH-01 Plan showing alterations to existing gas system to accommodate additional equipment installed.Sacramento County · 2023
Demo permits include structure and foundation/flat work only. No grading is included with this permit.; Interior demo for CBAC2022-00697Sacramento County · 2023$30,000
Tenant ImprovementCity of San Jose · 2014$50,000
Wetzel's Pretzels inside Walmart: CONVERSION OF EXISTING RETAIL SPACE FOR CONSTRUCTION OF WETZELS PRETZELS STORE CONSISTS OF COMPLETE TENANT INTERIORS CONSTRUCTION INCLUDING ALL REQUIRED PARTITIONS, CEILINGS, FLOORS, PLUMBING, ELECTRICAL, AND MECHANICAL SYSTEMS WITHIN THE LANDLORD'S LEASE SPACE.Sacramento County · 2026$12,000
EPC - EXPEDITED - SCOPE OF WORK TO INCLUDE REMOVEL OF CEILING SOFFIT AT FRONT COUNTER-REMOVAL OF SMALL
PARTS (6" POP-OUTS) AT DEMISING WALL. HOT DOG ON A STICK 586 SFCity of Sacramento · 2025$8,500
EXPEDITED - EPC - LANDLORD WORK IN PREPARATION FOR NEW TENANT. INSTALL ALUMINUM & GLASS STOREFRONT SYSTEM. INSTALL STOREFRONT WALL INSULATION, SHEATHING & ACM PANEL ON EXTERIOR SIDE OF EXISTING STUD FRAMING. INSTALL TWO ROOFTOP PACKAGE HVAC UNITS WITH SUPPLY & RETURN DROPS ONLY. INSTALL ELECTRICAL PANEL. RELOCATE EXISTING LIGHTS S REQUIRED AT STORAGE ROOM A1 & B1. NO OCCUPANCY REQUIRED FOR THIS PERMIT. 9,682 SF
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Sacramento · 2025
$145,000
EXPEDITED - EPC - LANDLORD WORK FOR FUTURE REMODEL- INCLUDES WORK IN (E) SUITES 112 & 115. DEMO INTERIOR WALLS. BUILD NEW WALLS FOR STORAGE ROOMS, INSTALL STOREFRONT STUDS FOR FRAMING OF FUTURE BUILDOUT FOR STOREFRONT OF TENANT SPACE. CAP AND SAFE OFF ALL UTILITIES.City of Sacramento · 2025$40,000
EOTC - Interior DEMO - DEMO NON-LOAD BEARING WALLS, FIXTURES AND FINISHES. TENANT SPACE IS 1881sf.City of Sacramento · 2025$8,500
EOTC - Annual accessibility upgrade for entire site. Removal of a portion of barriers at CR35B in the north-western portion of parking lot near enclosed mall entry #5, adjacent to sears entry towards parking garage.City of Sacramento · 2025$15,000
EPC - EXPEDITED - BUILD OUT FOR NEW FOOD SERVICE--HOT DOG ON A STICK. NEW KITCHEN EQUIPMENT, NEW KITCHEN HOOD, NEW FIXTURES AND FINISHES. IN EX. 1,686 S.F. SUITE 200, INSTALL NEW DEMISING WALL TO CREATE REDUCED 705 S.F. SUITE 200 FOR THIS FIRSTTIME T.I. PROJECT & LEAVING VACANT 981 S.F. REMAINDER SUITE. THIS SUITE PROJECT INCLUDES:
BUILD OUT OF NEW KITCHEN, NEW KITCHEN EQUIPMENT, HOOD WITH ANSUL; NEW FLOOR, WALL & CEILING FINISHES; NEW ACCESSIBLE TOILET ROOM W/ NEW EXHAUST FAN; NEW PLUMBING, HVAC AND ELECTRICL SYSTEMS;NEW EXTERIOR STOREFRONT.City of Sacramento · 2025$250,000
EPC - ACCESSIBILITY UPGRADE, REMOVAL OF A PORTION OF BARRIERS AT CURB RAMP 3 IN THE SOUTHERN PARKING LOT NEAR FOREVER 21, at Arden Fair Mall.City of Sacramento · 2024$15,000
EXPEDITED - FPP- SUITE 1274 - Interior demo-Demo interior walls, storefront bulkhead. Cap off water and sewer lines. Remove electrical panel.City of Sacramento · 2024$100,000
Permitted projects on public record. Addresses are omitted for privacy.