What the public permit record shows, not self-reported reviews.
Is PEI PLACER ELECTRIC INCORPORATED a real contractor?
PEI PLACER ELECTRIC INCORPORATED appears in public building-permit records with 10 permits filed through 2024 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is PEI PLACER ELECTRIC INCORPORATED's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to PEI PLACER ELECTRIC INCORPORATED by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is PEI PLACER ELECTRIC INCORPORATED licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. PEI PLACER ELECTRIC INCORPORATED has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is PEI PLACER ELECTRIC INCORPORATED's work?
The most recent permit on record for PEI PLACER ELECTRIC INCORPORATED is dated 2024-05-03, with 10 permits on file in total.
EPC - Add a counting Parking Assistance System to the Players Practice GarageCity of Sacramento · 2024$88,441
EPC - Installation of a Parking Guidance Assistance System. Channel & Raceways, cabling and cameras.City of Sacramento · 2024$116,948
EPC - Installation of Park Assist System - including Raceways, Channels, Cameras and System to Existing Parking GarageCity of Sacramento · 2023$191,164
Installation of (2) exterior Park Assist signs.City of Sacramento · 2022$687,680
EPC - Installation of Park Assist System for West Parking Garage.City of Sacramento · 2022$687,680
EPC - A new partition wall inside an existing telephone room at the event level of the Golden 1 Center. This will divide the room into a reduced telephone room and a new control room. in addition, minor work in suite area of arena will consist of adding furring at the existing concrete ceiling within the suites for mounting 38 new cameras within the suite levelCity of Sacramento · 2020$916,973
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you PEI PLACER ELECTRIC INCORPORATED?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to PEI PLACER ELECTRIC INCORPORATED's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
EXPEDITED - EPC Submittal - Addition - add 1 new Power/Data Pedestal for Broadcast power. all power will be supplied by an existing panel. New Load calculations are included in the drawings
City of Sacramento · 2019
$72,000
EPC Submittal - Addition to Commercial Building - add 1 new Power/Data Pedestal for Broadcast power. all power will be supplied by an existing panel. New Load calculations are included in the drawingsCity of Sacramento · 2019$72,000
EPC Submittal - Remodel of Commercial Building - Install a backup UPS to existing Panels. Room is 498 sq. ft.City of Sacramento · 2019$10,575
EPC - Remodel within the G1C to install a new electrical transformer and panel to feed from an existing disconnect for additional show power.City of Sacramento · 2018$81,250
Permitted projects on public record. Addresses are omitted for privacy.