What the public permit record shows, not self-reported reviews.
Is PEAK ELECTRIC a real contractor?
PEAK ELECTRIC appears in public building-permit records with 47 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is PEAK ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to PEAK ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is PEAK ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. PEAK ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is PEAK ELECTRIC's work?
The most recent permit on record for PEAK ELECTRIC is dated 2025-12-17, with 47 permits on file in total.
Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Like-per-like replacement of pre-existing 200A main panel with new 200A panelSacramento County · 2025$1,850
Replacement of pre-existing 100A main electrical panel with proposed 200A main electrical panelSacramento County · 2023$2,850
Main service panel replacement. Like per like. Pre-existing panel: 125 Amps, Proposed panel: 125 Amps. Underground ServiceSacramento County · 2021$2,850
Electrical Permit: 100 to 200 amp meter panel upgrade with service overhead. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.City of Sacramento · 2025$2,850
EPC - Like-for-like replacement of existing 100A meter/main panel supplying a 550 sq. ft. commercial laundry building. Work includes installation of new 100A meter panel, new 1-1/2" rigid riser, conductors, grounding conductor, and reconnection to existing 100A subpanel (not replaced).City of Sacramento · 2025$2,850
New Sub Panel Installation on existing detached garage. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2025
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you PEAK ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$2,850
EPC - New Sub Panel Installation. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2025$2,850
E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement.City of Sacramento · 2025$2,850
E-Permit: existing panel 125 Amps - Underground service, new main panel 125 Amps, N/A weather head/masthead work, main breaker replacement.City of Sacramento · 2025$2,850
Installation of a new dedicated 50A circuit for the EVSE, located within 3ft of the meter panel.City of Sacramento · 2025$1,355
Install 40a EV charger on exterior of home.City of Sacramento · 2025$1,892