What the public permit record shows, not self-reported reviews.
Is MOOC ELECTRIC a real contractor?
MOOC ELECTRIC appears in public building-permit records with 15 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MOOC ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MOOC ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MOOC ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MOOC ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MOOC ELECTRIC's work?
The most recent permit on record for MOOC ELECTRIC is dated 2025-09-26, with 15 permits on file in total.
Install 40a 240v EV charger circuit. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2024$1,500
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MOOC ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Install 40a 240v EV charger circuit. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2024
$1,500
Install 40amp 240v EV circuit in garage for charging. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2024$1,200
Install 30a 240v electric vehicle charger in garage. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2024$584
INSTALL LEVEL 2 40 AMP 240V ELECTICAL VEHICLE CHARGER IN GARAGE. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2024$500