What the public permit record shows, not self-reported reviews.
Is LUNA AIR a real contractor?
LUNA AIR appears in public building-permit records with 19 permits filed through 2026 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is LUNA AIR's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to LUNA AIR by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is LUNA AIR licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. LUNA AIR has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is LUNA AIR's work?
The most recent permit on record for LUNA AIR is dated 2026-04-13, with 19 permits on file in total.
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Like for like HVAC change out system.Sacramento County · 2026$9,500
client is getting a new roof and has requested to get new ductwork done at the same time no upgrades just like for like R-8 ductwork REV01 Like for like hvac change out on hvac system REV01 Like for like hvac change out on hvac systemSacramento County · 2026$5,000
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Bike for like 2 1/2 ton gas split systemSacramento County · 2024$8,000
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Removing existing HVAC system and replacing system with new updated system that works properly and is up to codeSacramento County · 2024$7,850
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Like for like HVAC system change outSacramento County · 2024$8,750
remove and reinstall Package HVAC both 4536 and 4538Sacramento County · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you LUNA AIR?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$2,000
No Duct Work Permitted. Change-out Roof Mount to Roof Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2025$8,940
No Duct Work Permitted. Change-out Roof Mount to Roof Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2024$8,940
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2024$8,790
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2024$8,790
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2024$8,790
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2023$8,790
Permitted projects on public record. Addresses are omitted for privacy.