What the public permit record shows, not self-reported reviews.
Is LAWSON MECHANICAL CONTRACTORS a real contractor?
LAWSON MECHANICAL CONTRACTORS appears in public building-permit records with 13 permits filed through 2024 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is LAWSON MECHANICAL CONTRACTORS's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to LAWSON MECHANICAL CONTRACTORS by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is LAWSON MECHANICAL CONTRACTORS licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. LAWSON MECHANICAL CONTRACTORS has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is LAWSON MECHANICAL CONTRACTORS's work?
The most recent permit on record for LAWSON MECHANICAL CONTRACTORS is dated 2024-10-14, with 13 permits on file in total.
Existing Fan coil to be replaced like for like. Existing Condensing unit to be replaced like for like. Existing refrigeration lines are to remain and be reused. Existing condensate is to be demolished and a new primary secondary condensate to be installed. Existing thermostat to be demolished and replaced with T24 compliant thermostat. New smoke detector to be installed.Sacramento County · 2023$21,302
Replace (2) 40-Ton Roof Top Mounted, Cooling Only, Package UnitsMarin County · 2023$240,740
DESIGN MODIFICATIONS TO THE CHILLED WATER (CHW) SYSTEM WILL CONVERT THE CONSTANT FLOW PRIMARY-SECONDARY SYSTEM TO A VARIABLE FLOW PRIMARY SYSTEM,
AND REPLACE THE (E) CHILLER. INCLUDE THE FOLLOWING:
· MODIFICATIONS TO PIPING AS REQUIRED INCLUDING THE DEMOLITION OF (E) MECHANICAL SYSTEM PIPING AS INDICATED FOR SYSTEM CHANGE-OUT
· CHANGE-OUT REPLACEMENT OF THE (E) SINGLE CHILLER WITH THREE (3) MODULAR CHILLERS
· THE ADDITION OF A (N) CHILLED WATER BUFFER TANK TO INCREASE THE CHILLED WATER SYSTEM CAPACITY
· CHANGE-OUT REPLACEMENT OF THE FOUR (4) (E) CHILLED WATER PUMPS (PRIMARY-SECONDARY SYSTEM) WITH A (N) CHILLED WATER PUMP (VARIABLE PRIMARY SYSTEM)
· CHANGE-OUT REPLACEMENT OF THE (E) CONDENSER WATER PUMP WITH A (N) CONDENSER WATER PUMP
· ADD HOT WATER INJECTION AND EXTRACTION PORTS TO THE (E) AIR HANDLING UNIT (AHU-2) COIL TO ADD HEATING CAPABILITY TO THE UNIT
· RENOVATE AND UPGRADE THE (E) ENERGY MANAGEMENT SYSTEM (EMS) TO OPERATE THE COOLING TOWER, CHILLERS, PUMPS, AHU'S, AND OTHER RELATED DEVICES
· MODIFY THE (E) REFRIGERANT MONITORING SYSTEM TO THE (N) CHILLER REFRIGERANT TYPE (R-410A)Sacramento County · 2022$705,000
EPC - Revision to COM-2320074: Condenser mounting anchors have been changed from 3/8" to 1/2".City of Sacramento · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you LAWSON MECHANICAL CONTRACTORS?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to LAWSON MECHANICAL CONTRACTORS's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
EPC - Tie-in of new exhaust duct from laboratory hood w/sash to existing exhaust duct in drop ceiling.City of Sacramento · 2023
$37,728
EPC - Replace fifteen (15) split system DX units to include Fan Coils and Condensing Units, replaced like for like or like in kind. Replace all thermostats with T24 compliant stats.
SEE REVISION COM-2422585: Condenser mounting anchors have been changed from 3/8" to 1/2".
SEE REVISION COM-2505599 Existing Scope - Replace 15 ducted split systems. The mounting details have changed.City of Sacramento · 2023$326,299
EPC - Replace one (1) ductless split system condenser with 3 new ones and nine (9) VRF ceiling mounted cassettes.City of Sacramento · 2023$180,000
Replace 6-feet of broken 4" cast iron pipe to grease interceptor.
If work is required within City Right of Way, the Applicant must submit an application for a construction encroachment permit and pay appropriate fees.City of Sacramento · 2020$8,500
Replace 35 ton HVAC Split System, Condenser Unit and Air Handler/Furnace serving the Chapel, like for like. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314,City of Sacramento · 2017$141,797
REPLACE 30 TON ROOFTOP HVAC WITH NEW.City of Sacramento · 2016$126,142
OSHPD III INSTALL 75GAL GAS WATER HEATER, NEW GAS AND HOT WATER PIPING, VALVES AND ACCESSORES TO (7) EXISTING FIXTURES IN HOSPITAL LAUNDRY/MAINTENANCE BUILDINGCity of Sacramento · 2016$49,990
Remove 3 existing booster pumps and skid plate and install 3 new booster pumps with skid plate.City of Sacramento · 2016$70,293
Permitted projects on public record. Addresses are omitted for privacy.