What the public permit record shows, not self-reported reviews.
Is JHP ELECTRIC INC a real contractor?
JHP ELECTRIC INC appears in public building-permit records with 12 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JHP ELECTRIC INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JHP ELECTRIC INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JHP ELECTRIC INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JHP ELECTRIC INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JHP ELECTRIC INC's work?
The most recent permit on record for JHP ELECTRIC INC is dated 2025-12-31, with 12 permits on file in total.
Replace 200 amp service panel with new 200amp solar ready panel. Install 11.2KW (28 Modules) roof mounted PV System. Using enphase micro inverters.
12481 Peach Lane.Sacramento County · 2025$28,000
Replace existing 100a main service panel with new 200a main service panelSacramento County · 2024$2,500
Replace existing 200amp main service panel with new 200amp main service panel.Sacramento County · 2021$2,500
Replace 4 sub panels and 1 transformer in the lobby electrical room (480v/277v x1, 208v/120v x3)(Step down transformer) and replace 2 sub panels and 1 transformer in the fleet office electrical room. (480v/277v x1, 208v/120v x1,)(Step down transformer)Sacramento County · 2025$60,000
13kw Solar PV System, 10 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).City of Sacramento · 2025$45,000
E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, Replacement weather head/masthead work.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JHP ELECTRIC INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to JHP ELECTRIC INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Sacramento · 2025
$3,000
E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work.City of Sacramento · 2024$2,500
6.3kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).”City of Sacramento · 2024$16,000
12kw Solar PV System, and 0gal Solar WH System (water heater installed null). install 12Kw roof mount PV system using emphase microinverters (30 qty REC 400w, 30qty enphase 1Q8+ microinverter)
install 2 enphase 5P batteries with smart controller and SPAN sub panel install EV charger hookup upgrade main electrical panel from 125a to 200a All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).”City of Sacramento · 2024$36,000
12kw Solar PV System, and 0gal Solar WH System (water heater installed null). INSTALLING 12KW ROOFMOUNTED PV SYSTEM USING ENPHASE MICROINVERTERS, INSTALL 2 ENPAHSE 5P BATTERS WITH SMART CONTROLLER AND SPAN SUB PANEL, INSTALL EV CHARGER HOOKUP, UPGRADE MAIN PANEL ELECTRICAL PANEL FROM 125A TO 200A.All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).”City of Sacramento · 2023$36,000
E-Permit: existing panel 125 Amps - Underground service, new main panel 125 Amps, N/A weather head/masthead work.City of Sacramento · 2023$3,000
E-Permit: existing panel 100 Amps - Underground service, new main panel 200 Amps, N/A weather head/masthead work.City of Sacramento · 2022$3,500
Permitted projects on public record. Addresses are omitted for privacy.