What the public permit record shows, not self-reported reviews.
Is IMPERIAL ELECTRIC SERVICE a real contractor?
IMPERIAL ELECTRIC SERVICE appears in public building-permit records with 13 permits filed through 2024 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is IMPERIAL ELECTRIC SERVICE's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to IMPERIAL ELECTRIC SERVICE by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is IMPERIAL ELECTRIC SERVICE licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. IMPERIAL ELECTRIC SERVICE has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is IMPERIAL ELECTRIC SERVICE's work?
The most recent permit on record for IMPERIAL ELECTRIC SERVICE is dated 2024-11-22, with 13 permits on file in total.
EPC - Installation of two extra DC fast Chargers.City of Sacramento · 2024$200,000
EPC - Installation of two extra DC fast ChargersCity of Sacramento · 2024$200,000
EPC - Installation of 4 EV DC Fast Chargers
SEE REVISION COM-2410856 - REVISED FIRE PUMP SERVICE FEED.City of Sacramento · 2023$300,000
EPC : INSTALLATION OF A SMUD CURRENT TRANSFORMER CABINET AND A METER SOCKET IN A METER PANEL TO PROVIDE UTILITY METERING FOR EXISTING ELECTRIC VEHICLE
CHARGING SYSTEM. NO WORK SHALL BE DONE ON PARKING SPACES OR EXISTING ELECTRIC VEHICLE CHARGING SYSTEM POWER DISTRIBUTION.City of Sacramento · 2021$6,500
Installation of a SMUD current transformer cabined and a meter socket in a meter panel to provide utility metering for existing electrical vehicle charging systemCity of Sacramento · 2021$6,000
EPC - REVISION TO COM-1922442: Revision to remove disconnects on the level 3 charging stations.City of Sacramento · 2020
EPC - REVISION TO COM-1922283: Remove level 3 chargers and show utility transformer
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you IMPERIAL ELECTRIC SERVICE?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to IMPERIAL ELECTRIC SERVICE's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Sacramento · 2020
EPC - Revision to Permit COM-1922150 - Revised the EV Panel Circuit Breaker from 250A to 225A.City of Sacramento · 2020
EPC Submittal - INSTALLATION OF ONE(1) 600A-277/480V-3PH-4W MAIN SWITCHBOARD, SIX (6) 208V-1P-40A-N3R EVBOX LEVEL 2 ELECTRIC VEHICLES CHARGER(S), FOUR (4) 480V-3P-100A-N3R TRITIUM DC FAST CHARGER(S) AND TWO (2) A.D.A PARKING STALLS. NEW ELECTRICAL SERVICE FOR INSTALLATION OF ELECTRIC VEHICLE CHARGERS.***REVISION TO COM-2005483: This revision is to change the location of the EVCS closer to the main street. THis revision is also to change the contractor provided transformer size from a 112.5kva to a 75kva.***
( **** SEE ATTACHMENT 12/16/2020**** request to withdraw Revision COM-2018087 )City of Sacramento · 2020$80,000
EPC Submittal - This project will consist of the installation of a 1200A 120/208V N3R with a 1200A main breaker switchgear, the installation of four (4) EV chargers, and the re-striping of existing parking lot to add two (2) ADA stalls capable of EV charging. No new transformer will be added. SEE REVISION COM-2010620: REVISION TO COM-1922442: Revision to remove disconnects on the level 3 charging stations.City of Sacramento · 2019$80,000
EPC Submittal - REVIEW 5-5-5 This project will consist of the installation of a 1200A 120/208V N3R with a 1200A main breaker switchgear, the installation of Four (4) EV chargers, and the re-striping of existing parking lot to add two (2) accessible stalls capable of EV charging. No new transformer being added. SEE REVISION COM-2010621: REVISION TO COM-1922283: Remove level 3 chargers and show utility transformerCity of Sacramento · 2019$80,000
EPC Submittal - REVIEW 5-5-5 The installation of five (5) EV Chargers and the re-stripping of an existing parking lot to add two (2) accessible stalls capable of EV Charging. Power will be distributed through and existing 1600A-277/480V Switchgear
revision COM-2009968 electrical pages crf 6-11-2020City of Sacramento · 2019$80,000
Permitted projects on public record. Addresses are omitted for privacy.